• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Ascot

On average, our 2 Installers near Ascot are rated: (4.46/5)
Order:

Your local MCS certified Solar PV and Solar thermal engineers to the South East and greater London. Fully qualified city and guilds and MCS Solar Installers and(...)

location icon 22 Pams Way, Ewell Court, Epsom, KT19 0HA

phone icon020 8393 5137

Basingstoke Energy Services Co-operative is owned by our workers; for the benefit our community. We provide high value renewable energy installations (solar PV(...)

location icon Belvedere House, Basing View, Basingstoke, RG21 4HG

phone icon01256 805372

On average, our 2 Installers near Ascot are rated: (4.46/5)
Order:

location iconNearby we also have installers in Bracknell Windlesham and Bagshot

Latest Job requests posted in Slough

02 Jul

Slough (SL1)

New Solar PV Installation with Battery

Direction of roof: South East. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 3 Months.

20 May

Slough (SL3)

New Battery Installation (Solar PV)

Direction of roof: Multiple. Roof style: Pitched/Angled. Material: Metal. Shading: Yes - Other. System size required: . Work Timescale: ASAP. Additional notes:(...)

26 Jan

Slough (SL1)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: ASAP.

31 Jul

Slough (SL2)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: Yes - Other. Work Timescale: Within 3 Months.

19 May

Marlow (SL7)

New Solar PV Installation

Direction of roof: South. Roof style: Flat. Material: Other. Shading: None. System size required: open to advice. Work Timescale: Within 6 Months.

10 Jan

Slough (SL2)

New Solar Thermal Installation

Direction of roof: Unsure. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: ASAP. Additional notes: please call(...)

06 Jan

Slough (SL2)

New Battery Installation (Solar PV)

Current system size: 12 panels. Current inverter: Unsure. Battery location: Open to advice. Work Timescale: ASAP.

28 Dec

Bourne End (SL8)

New Solar PV Installation

Current Fuel Used: Gas. Current system: Vaillant. Age: 11 - 15 yrs. Condition: Working. Location: kitchen - replace in the loft. Flue location: Wall. Work(...)

09 Dec

Slough (SL3)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: advice needed. Work Timescale: ASAP.

04 Nov

Windsor (SL4)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 5kw. Work Timescale: Within 3 Months.

23 Sep

Maidenhead (SL6)

New Solar PV Installation

Current Fuel Used: Electric. Current system: electric storage heaters. Age: Unsure. Condition: Working. Location: Open to advice on new location. Work(...)

02 Sep

Ascot (SL5)

Repair/Maintenance of Solar HW System

Current system size: unsure. Work Timescale: ASAP.

30 Aug

Maidenhead (SL6)

New Solar PV Installation

South. Pitched. Tiled. No shading. No windows. Open to advice. Yes to battery. ASAP.

22 Aug

Marlow (SL7)

New Solar PV Installation

Work Timescale: Within 1 Year. Additional notes: Drawings avaliable upon request.

04 Aug

Slough (SL3)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 3(...)

04 Aug

Windsor (SL4)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 6 Months. Additional notes:(...)

03 Aug

Maidenhead (SL6)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: advice needed. Work Timescale: Within 6 Months.

08 Jul

Slough (SL1)

New Battery Installation (Solar PV)

Current system size: Unsure. Current inverter: Unsure. Battery location: Open to advice. Work Timescale: ASAP.

23 May

Slough (SL2)

New Solar PV Installation

Current Fuel Used: Electric. Number of Bedrooms: 5+. Number of rooms: 11-15. Property Age: After 1980. Insulation: Loft & Cavity wall. Windows: Double glazing.(...)

05 Apr

Gerrards Cross (SL9)

Repair/Maintenance of Solar PV System

Current system size: 3kw. Work Timescale: Within 3 Months. Additional notes: Looking to add on ton an existing 3kw system.

01 Apr

Slough (SL2)

New Solar PV Installation

Roof direction: unsure. Pitched. Tiled. Shading from a tree. No windows. Open to suggestions regarding system size. Battery. Install: within 1 year.

08 Mar

Ascot (SL5)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Maximum advice from installer. Work Timescale:(...)

31 Jan

Ascot (SL5)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 16 panels. Work Timescale: ASAP.

25 Jan

Ascot (SL5)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 16 panels. Work Timescale: ASAP.

08 Nov

Maidenhead (SL6)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Flat. Material: Unsure. Shading: None. System size required: Open to advice. Work Timescale: Within 1 Month.

20 Oct

Maidenhead (SL6)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 6 Months.(...)

08 Oct

Maidenhead (SL6)

New Battery Installation (Solar PV)

Current system size: 10 KW. Current inverter: Unsure. Battery location: Garage. Work Timescale: ASAP. Additional notes: *** Looking for Tesla Battery 3 Phase.

20 Sep

Slough (SL1)

New Battery Installation (Solar PV)

Current system size: 4kw. Current inverter: Solar Edge. Battery location: Open to advice. Work Timescale: ASAP.

16 Aug

Maidenhead (SL6)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: ASAP.

06 Aug

Marlow (SL7)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Other. Shading: None. System size required: Open to advice. Work Timescale: Within 3(...)

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue