• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Iver

On average, our 4 Installers near Iver are rated: (4.47/5)
Order:

Renewable energy installer offering design, supply and installation services. Accredited to the highest standards through MCS and Trustmark.

Responsive -(...)

location icon 152-160 City Road, London, EC1V 2NX

phone icon07742420552

Save money on your energy bills and get between 12-20% returns under the latest FIT tariff.
We also install solar panels with EnPhase micro inverters,(...)

location icon C/O Big Yellow Storage Unit 1 Cobbett Park, 22 To 28 Moorfield Road, Slyfield Industrial Estate, Guildford, GU1 1RU

phone icon0800 888 6544

Solinvictus are a St Albans based solar PV and solar thermal specialist.

location icon Unit B3, 156 St Albans Road Industrial Estate,, 156 St Albans Road, St. Albans, AL4 9LP

phone icon01727840555

Women owned and operated, Athena Electrical has over 20 years of experience in the electrical contracting industry. Our strength lies in technical expertise(...)

location icon 190, Evering Road, London, E5 8AJ

phone icon020 7503 6211

On average, our 4 Installers near Iver are rated: (4.47/5)
Order:

location iconNearby we also have installers in Uxbridge West Drayton and Hayes

Latest Job requests posted in Slough

02 Jul

Slough (SL1)

New Solar PV Installation with Battery

Direction of roof: South East. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 3 Months.

20 May

Slough (SL3)

New Battery Installation (Solar PV)

Direction of roof: Multiple. Roof style: Pitched/Angled. Material: Metal. Shading: Yes - Other. System size required: . Work Timescale: ASAP. Additional notes:(...)

26 Jan

Slough (SL1)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: ASAP.

31 Jul

Slough (SL2)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: Yes - Other. Work Timescale: Within 3 Months.

19 May

Marlow (SL7)

New Solar PV Installation

Direction of roof: South. Roof style: Flat. Material: Other. Shading: None. System size required: open to advice. Work Timescale: Within 6 Months.

10 Jan

Slough (SL2)

New Solar Thermal Installation

Direction of roof: Unsure. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: ASAP. Additional notes: please call(...)

06 Jan

Slough (SL2)

New Battery Installation (Solar PV)

Current system size: 12 panels. Current inverter: Unsure. Battery location: Open to advice. Work Timescale: ASAP.

28 Dec

Bourne End (SL8)

New Solar PV Installation

Current Fuel Used: Gas. Current system: Vaillant. Age: 11 - 15 yrs. Condition: Working. Location: kitchen - replace in the loft. Flue location: Wall. Work(...)

09 Dec

Slough (SL3)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: advice needed. Work Timescale: ASAP.

04 Nov

Windsor (SL4)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 5kw. Work Timescale: Within 3 Months.

23 Sep

Maidenhead (SL6)

New Solar PV Installation

Current Fuel Used: Electric. Current system: electric storage heaters. Age: Unsure. Condition: Working. Location: Open to advice on new location. Work(...)

02 Sep

Ascot (SL5)

Repair/Maintenance of Solar HW System

Current system size: unsure. Work Timescale: ASAP.

30 Aug

Maidenhead (SL6)

New Solar PV Installation

South. Pitched. Tiled. No shading. No windows. Open to advice. Yes to battery. ASAP.

22 Aug

Marlow (SL7)

New Solar PV Installation

Work Timescale: Within 1 Year. Additional notes: Drawings avaliable upon request.

04 Aug

Slough (SL3)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 3(...)

04 Aug

Windsor (SL4)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 6 Months. Additional notes:(...)

03 Aug

Maidenhead (SL6)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: advice needed. Work Timescale: Within 6 Months.

08 Jul

Slough (SL1)

New Battery Installation (Solar PV)

Current system size: Unsure. Current inverter: Unsure. Battery location: Open to advice. Work Timescale: ASAP.

23 May

Slough (SL2)

New Solar PV Installation

Current Fuel Used: Electric. Number of Bedrooms: 5+. Number of rooms: 11-15. Property Age: After 1980. Insulation: Loft & Cavity wall. Windows: Double glazing.(...)

05 Apr

Gerrards Cross (SL9)

Repair/Maintenance of Solar PV System

Current system size: 3kw. Work Timescale: Within 3 Months. Additional notes: Looking to add on ton an existing 3kw system.

01 Apr

Slough (SL2)

New Solar PV Installation

Roof direction: unsure. Pitched. Tiled. Shading from a tree. No windows. Open to suggestions regarding system size. Battery. Install: within 1 year.

08 Mar

Ascot (SL5)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Maximum advice from installer. Work Timescale:(...)

31 Jan

Ascot (SL5)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 16 panels. Work Timescale: ASAP.

25 Jan

Ascot (SL5)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 16 panels. Work Timescale: ASAP.

08 Nov

Maidenhead (SL6)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Flat. Material: Unsure. Shading: None. System size required: Open to advice. Work Timescale: Within 1 Month.

20 Oct

Maidenhead (SL6)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 6 Months.(...)

08 Oct

Maidenhead (SL6)

New Battery Installation (Solar PV)

Current system size: 10 KW. Current inverter: Unsure. Battery location: Garage. Work Timescale: ASAP. Additional notes: *** Looking for Tesla Battery 3 Phase.

20 Sep

Slough (SL1)

New Battery Installation (Solar PV)

Current system size: 4kw. Current inverter: Solar Edge. Battery location: Open to advice. Work Timescale: ASAP.

16 Aug

Maidenhead (SL6)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: ASAP.

06 Aug

Marlow (SL7)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Other. Shading: None. System size required: Open to advice. Work Timescale: Within 3(...)

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue