• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Dronfield

On average, our 2 Installers near Dronfield are rated: (4.65/5)
Order:

Solar Panel and Battery Storage Installation Company - Domestic and Commercial. We are a family-run, Yorkshire-based Renewable Energy Installations company(...)

location icon Unit 8, 33 Barnsley Road, Sheffield, S36 8AE

phone icon07715141109

Here at Ecogen our aim is to give our customers the perfect solution to drive down the spiralling costs of todays energy bills.

location icon Unit 51 Cannon Way,Claycliffe Business Park, Claycliffe Road, Barugh Green, Barnsley, S75 1JU

phone icon01226281646

On average, our 2 Installers near Dronfield are rated: (4.65/5)
Order:

location iconNearby we also have installers in Chesterfield Sheffield and Hope Valley

Latest Job requests posted in Sheffield

30 Apr

Chesterfield (S41)

New Solar PV Installation with Battery

Direction of roof: Multiple. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 3 Months.

06 Nov

Hope Valley (S32)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Other. Shading: None. Work Timescale: Within 1 Month. Additional notes: property is a barn(...)

02 Oct

Sheffield (S35)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Other. Shading: None. System size required: open to suggestions. Work Timescale: ASAP.(...)

01 Mar

Rotherham (S65)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP. Additional(...)

28 Dec

Sheffield (S17)

New Solar PV Installation

Work Timescale: Within 1 Month.

15 Dec

Doncaster (S25)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: Within 3(...)

18 Nov

Sheffield (S12)

Repair/Maintenance of Solar HW System

Current system size: 2 panels. Work Timescale: ASAP.

16 Nov

Sheffield (S9)

New Battery Installation (Solar PV)

Current system size: 37 panels. Current inverter: ABB Trio. Battery location: Open to advice. Work Timescale: Within 1 Month.

07 Nov

Rotherham (S63)

New Solar PV Installation

System required: Open to advice. Current Fuel Used: Gas. Age: 6 - 10 yrs. Number of Bedrooms: 5+. Number of rooms: 11-15. Property Age: After 1980. Insulation:(...)

19 Oct

Rotherham (S60)

New Solar Thermal Installation

Direction of roof: South West. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: ASAP.

13 Oct

Rotherham (S60)

New Solar Thermal Installation

Service

03 Oct

Sheffield (S7)

New Solar PV Installation

Direction of roof: South. Roof style: Flat. Material: Unsure. Shading: None. Work Timescale: Within 6 Months.

14 Aug

Dronfield (S18)

New Solar PV Installation

Direction of roof *South Roof style *Flat Roof material * Other Shading *Yes - Nearby building Any windows on roof? *No System size required? Open to advice Are(...)

05 Jul

Chesterfield (S40)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 6 Months.

13 May

Rotherham (S61)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: Yes. Work Timescale: ASAP.

12 May

Hope Valley (S32)

New Battery Installation (Solar PV)

Current system size: not got one yet. Current inverter: not got one yet. Battery location: open to advice. Work Timescale: Within 3 Months. Additional notes:(...)

26 Apr

Rotherham (S60)

New Solar PV Installation

Current Fuel Used: Gas. Number of Bedrooms: 5. Number of rooms: 6-10. Property Age: ····-····. Insulation: Cavity wall(...)

19 Apr

Sheffield (S35)

New Battery Installation (Solar PV)

Current system size: 7kw. Current inverter: unsure. Battery location: closet. Work Timescale: Within 3 Months.

10 Mar

Chesterfield (S43)

New Solar PV Installation

Direction of roof: West. Roof style: Unsure. Material: Other. Shading: None. System size required: Open to suggestions. Work Timescale: ASAP.

06 Mar

Sheffield (S35)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 1 Month.

21 Feb

Chesterfield (S42)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Other. Shading: None. System size required: 6kw. Work Timescale: ASAP.

14 Feb

Chesterfield (S42)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 4kwh. Work Timescale: ASAP.

25 Jan

Dronfield (S18)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: ASAP.

09 Dec

Worksop (S80)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: not sure. Work Timescale: ASAP.

21 Sep

Barnsley (S75)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: Within 1 Year.

09 Aug

Barnsley (S71)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Unsure. Shading: None. System size required: Discuss with engineer. Work Timescale: Within 1(...)

06 Jul

Sheffield (S12)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 3 Months.

21 Jun

Worksop (S80)

New Solar Thermal Installation

Direction of roof: Unsure. Roof style: Flat. Material: Unsure. Shading: None. null: No. Work Timescale: Within 3 Months.

21 Jun

Worksop (S80)

New Solar PV Installation

Roof: Unsure. Flat and unsure of material. No shading that will efefct the panels. No windows in the roof. Looking for a 6kwh size system. Install within 3(...)

08 Jun

Mexborough (S64)

New Solar PV Installation

Roof: East to West. Pitched and tiled. Maybe shading from next door roof. No windows in roof. 4KW system preferred. Install ASAP. Contact anytime.

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue