• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Glossop

On average, our 3 Installers near Glossop are rated: (4.75/5)
Order:

Established in 2008, Homeco Energy specialise in the design and installation of solar PV, Battery storage and EV charging systems to domestic and commercial(...)

location icon The Home Efficiency Centre, 77 Baslow Road, Sheffield, S17 4DP

phone icon0114 293 5019

Here at Ecogen our aim is to give our customers the perfect solution to drive down the spiralling costs of todays energy bills.

location icon Unit 51 Cannon Way,Claycliffe Business Park, Claycliffe Road, Barugh Green, Barnsley, S75 1JU

phone icon01226281646

Mack Solar is a Sheffield based business that provides Solar PhotoVoltaic installations (electric producing solar panels), maintenance and repair for domestic(...)

location icon 173 Prospect Road, Totley Rise, Sheffield, S17 4HY

phone icon01143211788

On average, our 3 Installers near Glossop are rated: (4.75/5)
Order:

location iconNearby we also have installers in Stalybridge Hyde and Dukinfield

Latest Job requests posted in Stockport

25 Jul

Stockport (SK3)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 1 Month.

28 May

Stockport (SK7)

New Solar Thermal Installation

Direction of roof: East. Material: Other. Roof style: Multiple. Shading: Yes - Nearby tree. Windows on roof: Yes. Work Timescale: ASAP.

11 May

Cheadle (SK8)

New Solar PV Installation with Battery

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: ASAP. Additional notes: Renovations.

23 Apr

High Peak (SK23)

New Solar PV Installation

Work Timescale: ASAP.

23 Feb

Macclesfield (SK10)

New Solar Thermal Installation

Direction of roof: South. Material: Unsure. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 1 Month.

26 Jan

Macclesfield (SK11)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to suggestions. Work Timescale: Within 3(...)

19 Jan

High Peak (SK23)

New Battery Installation (Solar PV)

Current system size: 16 panels. Current inverter: Unsure. Battery location: Loft. Work Timescale: Within 1 Month.

11 Jan

Buxton (SK17)

New Solar PV Installation

System required: Air to wet. Current Fuel Used: Gas. Age: Over 16 yrs. Number of Bedrooms: 2. Number of rooms: 6-10. Property Age:(...)

08 Oct

Macclesfield (SK10)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP.

04 Jul

Cheadle (SK8)

New Solar PV Installation

Direction of roof: North East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 4-6kwh. Work Timescale: Within 6 Months.

10 Jun

Macclesfield (SK10)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 6 Months.

07 Jun

Macclesfield (SK11)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 3 Months. Additional notes:(...)

06 Apr

Cheadle (SK8)

New Solar PV Installation

Current Fuel Used: Gas. Number of Bedrooms: 4. Number of rooms: 6-10. Property Age: ····-····. Insulation: Loft only.(...)

22 Mar

Stockport (SK7)

New Solar PV Installation

Current Fuel Used: Oil. Current system: Mistral. Age: Over 16 yrs. Condition: Working. Location: Garage, possibly keep there. Work Timescale: Within 3 Months.

10 Mar

Buxton (SK17)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Discuss with installer - maximum. Work Timescale:(...)

10 Mar

Stockport (SK5)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 1 Month.

25 Feb

Macclesfield (SK11)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Other. Shading: Yes - Nearby tree. System size required: be advised. Work Timescale: ASAP.

16 Feb

Macclesfield (SK11)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP.

30 Jan

Wilmslow (SK9)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Unsure. Shading: None. System size required: Discuss with engineer. Work Timescale: Within 6(...)

20 Jan

Wilmslow (SK9)

New Solar Thermal Installation

Direction of roof: East. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: Yes. Work Timescale: Within 3 Months. Additional notes:(...)

30 Nov

Hyde (SK14)

New Battery Installation (Solar PV)

Current system size: 4kw maybe. Current inverter: Solar Edge. Battery location: Garage. Work Timescale: ASAP. Additional notes: Customer would only like to hear(...)

09 Sep

Cheadle (SK8)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby building. System size required: Open to advice. Work Timescale:(...)

30 Jul

Hyde (SK14)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Discuss with installer. Work Timescale: ASAP.

14 Jun

Macclesfield (SK10)

New Solar Thermal Installation

Roof: South West. Pitched and Tiled. There is no shading that will effect the panels No windows in the roof. Looking for 4kwh size system. Install ASAP. Contact(...)

14 Jun

Macclesfield (SK10)

New Solar PV Installation

Roof: South West. Pitched and Tiled. There is no shading that will effect the panels No windows in the roof. Looking for 4kwh size system. Install ASAP. Contact(...)

10 Jun

Glossop (SK13)

New Solar Thermal Installation

Roof direction: South-East Facing. Pitched and slated. No shading and no windows in the roof. Up to 3-4 KW system. Customer is unsure about whether they have an(...)

21 Sep

High Peak (SK23)

New Solar PV Installation

Roof: South facing. Pitched and slated. Might have shading from next door. Has 3 veluxes on the roof. Install within 3 month. Contact anytime.

19 Jan

Glossop (SK13)

New Solar PV Installation

Roof: South facing. Pitched and slate. No shading. No windows on the roof. Install within 1 month. Contact anytime.

02 Nov

High Peak (SK23)

New Solar Thermal Installation

Direction of roof: South facing. Pitched, tiled roof. No chimneys. No windows. Small amount of shading from next door. Call anytime. Install within 6 months.

25 Jun

High Peak (SK23)

Repair/Maintenance of Solar HW System

We have a solar system which we recently upgraded 3 years ago to include an unvented tank (Gledhill) and vaillent boiler (37kw). I suspect the engineers who(...)

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue