- Compare up to 4 FREE quotes
- Get solar panels with 0% VAT
- Save up to £915 per year
Find Solar PV and Solar Thermal installers in Hope Valley
Advance Renewable Energy Ltd - AR-Energy.
AR-Energy are an established renewable energy and boiler istallation company, based in South Yorkshire with coverage Nationwide. We provide expert advice on(...)
Office 3, 51 High Street , Acorn Business Centre, Barnsley, S63 7JY
07912665941
Latest Job requests posted in Sheffield
Chesterfield (S41)
New Solar PV Installation with Battery
Direction of roof: Multiple. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 3 Months.
Hope Valley (S32)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Other. Shading: None. Work Timescale: Within 1 Month. Additional notes: property is a barn(...)
Sheffield (S35)
New Solar PV Installation
Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Other. Shading: None. System size required: open to suggestions. Work Timescale: ASAP.(...)
Rotherham (S65)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP. Additional(...)
Sheffield (S17)
New Solar PV Installation
Work Timescale: Within 1 Month.
Doncaster (S25)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: Within 3(...)
Sheffield (S12)
Repair/Maintenance of Solar HW System
Current system size: 2 panels. Work Timescale: ASAP.
Sheffield (S9)
New Battery Installation (Solar PV)
Current system size: 37 panels. Current inverter: ABB Trio. Battery location: Open to advice. Work Timescale: Within 1 Month.
Rotherham (S63)
New Solar PV Installation
System required: Open to advice. Current Fuel Used: Gas. Age: 6 - 10 yrs. Number of Bedrooms: 5+. Number of rooms: 11-15. Property Age: After 1980. Insulation:(...)
Rotherham (S60)
New Solar Thermal Installation
Direction of roof: South West. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: ASAP.
Rotherham (S60)
New Solar Thermal Installation
Service
Sheffield (S7)
New Solar PV Installation
Direction of roof: South. Roof style: Flat. Material: Unsure. Shading: None. Work Timescale: Within 6 Months.
Dronfield (S18)
New Solar PV Installation
Direction of roof *South Roof style *Flat Roof material * Other Shading *Yes - Nearby building Any windows on roof? *No System size required? Open to advice Are(...)
Chesterfield (S40)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 6 Months.
Rotherham (S61)
New Solar Thermal Installation
Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: Yes. Work Timescale: ASAP.
Hope Valley (S32)
New Battery Installation (Solar PV)
Current system size: not got one yet. Current inverter: not got one yet. Battery location: open to advice. Work Timescale: Within 3 Months. Additional notes:(...)
Rotherham (S60)
New Solar PV Installation
Current Fuel Used: Gas. Number of Bedrooms: 5. Number of rooms: 6-10. Property Age: ····-····. Insulation: Cavity wall(...)
Sheffield (S35)
New Battery Installation (Solar PV)
Current system size: 7kw. Current inverter: unsure. Battery location: closet. Work Timescale: Within 3 Months.
Chesterfield (S43)
New Solar PV Installation
Direction of roof: West. Roof style: Unsure. Material: Other. Shading: None. System size required: Open to suggestions. Work Timescale: ASAP.
Sheffield (S35)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 1 Month.
Chesterfield (S42)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Other. Shading: None. System size required: 6kw. Work Timescale: ASAP.
Chesterfield (S42)
New Solar PV Installation
Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 4kwh. Work Timescale: ASAP.
Dronfield (S18)
New Solar PV Installation
Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: ASAP.
Worksop (S80)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: not sure. Work Timescale: ASAP.
Barnsley (S75)
New Solar PV Installation
Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: Within 1 Year.
Barnsley (S71)
New Solar PV Installation
Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Unsure. Shading: None. System size required: Discuss with engineer. Work Timescale: Within 1(...)
Sheffield (S12)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 3 Months.
Worksop (S80)
New Solar Thermal Installation
Direction of roof: Unsure. Roof style: Flat. Material: Unsure. Shading: None. null: No. Work Timescale: Within 3 Months.
Worksop (S80)
New Solar PV Installation
Roof: Unsure. Flat and unsure of material. No shading that will efefct the panels. No windows in the roof. Looking for a 6kwh size system. Install within 3(...)
Mexborough (S64)
New Solar PV Installation
Roof: East to West. Pitched and tiled. Maybe shading from next door roof. No windows in roof. 4KW system preferred. Install ASAP. Contact anytime.
Don't just take our word for it.
Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.