• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Chelmsford

On average, our 6 Installers near Chelmsford are rated: (4.24/5)
Order:

Solar battery add ons to p.v systems, and p.v. repairs undertaken

location icon 7 Oaklands Drive, Harlow, CM17 9BE

phone icon07836689689

Everyone’s Energy provides exactly what it says in the title. Energy for everyone! – namely sustainable, renewable and affordable. Imagine discovering you(...)

location icon Office 14 Westgate House West Square, Floor 3, Harlow, CM20 1YS

phone icon07510085764

Specialist in all renewable aspects including Solar PV, Battery Storage and Air Source Heat Pumps. We are RHI installer of the year for the South East region(...)

location icon Queen Court, 9-17 Eastern Road, Romford, RM1 3NH

phone icon07736740237

Woodford Renewables and SmartTECH drives sustainability and energy savings for commercial and residential projects in the UK, reducing carbon emissions and(...)

location icon First Floor, Oakwood House, Oakwood Hill Industrial Estate, Loughton, IG10 3TZ

phone icon+447415136894

Pure Energy are a market leading renewable energy company based across the UK installing a wide range of award-winning products.

location icon The Old Courthouse, Orsett Road, Grays, RM17 5DD

phone icon02039363785

EFS Ltd is a Solar PV and Electrical contracting company established since 1971. We install, design and maintain Solar PV systems from 1KW domestic to 1(...)

location icon 2 Hillybroom Gardens, West Mersea, Colchester, CO5 8UG

phone icon01206386965

On average, our 6 Installers near Chelmsford are rated: (4.24/5)
Order:

location iconNearby we also have installers in Ingatestone Billericay and Witham

Latest Job requests posted in Chelmsford

26 Apr

Chelmsford (CM2)

Repair/Maintenance of Solar PV System

Work Timescale: Within 3 Months.

09 Apr

Epping (CM16)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 6 Months.

24 Oct

Witham (CM8)

New Solar PV Installation with Battery

Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: None. Work Timescale: Within 3 Months.

24 Oct

Maldon (CM9)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Other. Shading: None. Work Timescale: Within 1 Year. Additional notes: pipe ar up to the roof.

18 May

Braintree (CM7)

New Solar PV Installation

Direction of roof: South West. Roof style: Other. Material: Tiled. Shading: None. System size required: open to advise. Work Timescale: ASAP. Additional notes:(...)

21 Feb

Bishop's Stortford (CM23)

New Battery Installation (Solar PV)

Current system size: 5kw. Current inverter: Micro Inverter. Battery location: loft. Work Timescale: ASAP.

19 Oct

Harlow (CM18)

New Battery Installation (Solar PV)

Current system size: economy seven//. Current inverter: Unsure. Battery location: open to advice/ electric cupboard. Work Timescale: ASAP.

10 Sep

Chelmsford (CM1)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 1 Year.

05 Jul

Brentwood (CM13)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Work Timescale: ASAP. Material: Tiled. Shading: None. System size required: advice needed.

27 May

Bishop's Stortford (CM22)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: 40 panels. Work Timescale: Within 6(...)

31 Mar

Bishop's Stortford (CM22)

New Solar PV Installation

System required: Air to wet. Current Fuel Used: Gas. Age: 11 - 15 yrs. Number of Bedrooms: 4. Number of rooms: 6-10. Property Age: After 1980. Insulation:(...)

26 Feb

Chelmsford (CM2)

New Solar PV Installation

Current Fuel: Gas Current Boiler: Hot air system. Install ASAP. Contact anytime.

23 Feb

Chelmsford (CM1)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: Within 6(...)

03 Feb

Bishop's Stortford (CM23)

New Battery Installation (Solar PV)

Current system size: 3 KW. Current inverter: Unsure. Battery location: Garage. Work Timescale: Within 6 Months.

11 Oct

Braintree (CM77)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Other. Material: Other. Shading: None. System size required: Open to suggestions. Work Timescale: ASAP. Additional notes:(...)

07 Oct

Witham (CM8)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 6 Months.

06 Oct

Bishop's Stortford (CM22)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: 6-7 KW. Work Timescale: ASAP.

22 Sep

Bishop's Stortford (CM23)

New Solar PV Installation

Direction of roof: North. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 6 Months.(...)

17 Aug

Maldon (CM9)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: Within 6(...)

13 Jun

Harlow (CM18)

New Solar PV Installation

Roof direction: Unsure. Pitched and tiled. No shading and some windows in the roof. Open to advice on the size of the system. Interested in discussing a battery(...)

11 Jun

Braintree (CM7)

New Solar PV Installation

Solar PV. Roof: West/East. Pitched and tiled. No real shading to affect panels. No windows on roof. Will speak to installer regarding size of system. Will(...)

13 Oct

Maldon (CM9)

New Solar PV Installation

Roof: South. Pitched and tiled. No Shading. Has 4 velux windows on the roof. Wants a 4-5kw system. Install ASAP. Contact anytime

02 Oct

Chelmsford (CM1)

New Solar Thermal Installation

Roof facing: South. Pitched and tiled. No shading. No windows. Open to advice on system size. There is a water cylinder. Install: 6 months. Contact anytime.

01 Mar

Witham (CM8)

New Solar PV Installation

Roof facing: North. Pitched and ashfelt tiles. No shading and no windows. Open to advice on system. Install within 6 months. Contact anytime.

25 Sep

Maldon (CM9)

New Solar PV Installation

Solar PV. East west facing roof. Pitched and tiled. No shading. No windows. Open to advise on system size. Work timescale with 6 months. Contact anytime.

09 Jul

Brentwood (CM15)

New Solar Thermal Installation

Supply and fit of Solar Thermal, Roof Faces East, Pitched and tiled. No windows, Timescale within 3 months. Contact anytime.

04 Jun

Ongar (CM5)

New Solar Thermal Installation

Solar Thermal. South facing roof. Pitched and tiled. No shading. No windows. Open to advise on system size. Work timescale with 3 months. Contact anytime.

10 Apr

Southminster (CM0)

Repair/Maintenance of Solar HW System

Repair of a 5 year old. 1 panel Solar Thermal installation. Inverter: unsure. Leaking. Repair ASAP. Contact: anytime

19 Mar

Chelmsford (CM3)

New Solar Thermal Installation

Roof: Unsure of direction. Pitched and Felt. No shading. No windows. Open to advice on the size of the system needed. Install ASAP. Contact Afternoons.

06 Mar

Maldon (CM9)

New Solar PV Installation

Roof: Unsure. Pitched and tiled. No windows. No shading. Would like to replace the old 10 panel system and open to advice on system. Replace within 1 month and(...)

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue