• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Clacton-On-Sea

On average, our 1 Installers near Clacton-On-Sea are rated: (4.12/5)
Order:

At Clarkes 24/7 we offer professional property maintenance for both routine and emergency services with specialist in Gas, Plumbing and Electrics

location icon 89 High Street, Hadleigh, Ipswich, IP7 5EA

phone icon02072473650

On average, our 1 Installers near Clacton-On-Sea are rated: (4.12/5)
Order:

location iconNearby we also have installers in Frinton-On-Sea Walton On The Naze and Manningtree

Latest Job requests posted in Colchester

04 Sep

Colchester (CO7)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: ASAP.

28 Apr

Colchester (CO5)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Other. Shading: None. System size required: Open to advice. Work Timescale: ASAP. Additional(...)

24 Apr

Colchester (CO3)

New Battery Installation (Solar PV)

Current system size: 14. Current inverter: unsure. Battery location: outside house. Work Timescale: Within 3 Months.

04 Mar

Colchester (CO5)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advise. Work Timescale: ASAP.

04 Mar

Colchester (CO5)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advise. Work Timescale: ASAP.

12 Jan

Clacton-on-Sea (CO16)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP.

31 Oct

Sudbury (CO10)

New Solar Thermal Installation

Direction of roof: Unsure. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 1 Month. Additional notes:(...)

17 Aug

Colchester (CO7)

New Solar Thermal Installation

Direction of roof: East. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 3 Months.

07 Jul

Colchester (CO4)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice, 12-16 panels. Work Timescale: Within(...)

09 Feb

Sudbury (CO10)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: None. System size required: Open to advice - maximise the space. Work Timescale:(...)

04 Oct

Manningtree (CO11)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Discuss with installer. Work Timescale: Within 1(...)

24 May

Clacton-on-Sea (CO15)

New Solar PV Installation

Roof: Multiple roofs. Pitched and tiled. No shading. No windows in roof. Open to advice on system. Install ASAP. Contact anytime.

09 Mar

Colchester (CO5)

New Solar PV Installation

Roof: South Facing. Pitched and Tiled. No Shading. No Windows. looking for a 4Kw System. Install within 3 months. Contact anytime.

19 Jan

Sudbury (CO10)

New Solar PV Installation

Solar panel system with batteries. Detached house, south facing roof, space for a good sized system. Install within 6 months. Contact anytime.

10 Nov

Sudbury (CO10)

New Solar PV Installation

Roof: south. Pitched and tiled. Slight shading. No windows in the roof. Open to advise on system size. Install within 1 month. Contact anytime.

22 Oct

Sudbury (CO10)

New Solar PV Installation

Supply and fit of Solar PV with battery for the Town hall. Pitched and slated. unsure which way roof faces. no windows in the roof. Timescale within 3 months.(...)

07 Mar

Sudbury (CO10)

Phone Quote - New Solar PV Install

Phone quote for Solar PV. Install: 6 months. Contact anytime.

19 Jun

Colchester (CO7)

New Solar PV Installation

For garage roof. Roof facing: South ish. Pitched & tiled. No shading. 2 x skylights. Open to suggestions regarding system size and battery. Install: within 1(...)

24 Apr

Halstead (CO9)

New Solar Thermal Installation

Supply and fit of Solar Thermal. Roof faces East, Pitched and tiled, No shading. Timescale within 6 months. Contact after 3pm.

21 Mar

Halstead (CO9)

New Solar PV Installation

Roof: Unsure. Pitched and tiled. No windows. No shading. Open to advice on system size and battery. Install within 6 months and contact anytime

12 Dec

Halstead (CO9)

Repair/Maintenance of Solar PV System

Solar panel meter not moving on.

21 Aug

Clacton-on-Sea (CO15)

Repair/Maintenance of Solar PV System

Health check on our solar panels

15 Aug

Clacton-on-Sea (CO16)

New Solar PV Installation

Supply and Fit of a 2.5kW solar PV powered system, possibly with battery storage. roof faces South. Pitched and tiled. No shading. Timescale within 6 months.(...)

27 May

Bures (CO8)

Repair/Maintenance of Solar PV System

Replacement of Grundfos Solar 15-65 pump (easily accessible at ground level) for 48 tubes on ground level. Timescale ASAP. Contact anytime.

04 Apr

Colchester (CO1)

New Solar Thermal Installation

I currently have an 8 panel solar PV system. I would like to add a solar thermal system Thank you. ·····

17 Mar

Clacton-on-Sea (CO15)

Repair/Maintenance of Solar PV System

Maintenance of Solar PV installation. Main wiring from panels to meter damaged/water leak causing power to trip in the rain. Panels work fine when there is no(...)

15 Oct

Clacton-on-Sea (CO15)

New Solar PV Installation

4 bed detached. Additional 1.1Kw of panels spli between East & South facing roofs, Already have 3.3Kw on West facing Roof. Pitched and tiled. No windows. No(...)

01 Aug

Sudbury (CO10)

Repair/Maintenance of Solar PV System

Repair/replace a SOLAR PVC that has a broken glass cover. Make: Sunlink 245w Mono. Call anytime. ASAP

27 Jul

Harwich (CO12)

New Solar PV Installation

5 bed detached. Roof: not sure of direction. Pitched and tiled. 3 velux on back. 2 dormers on front. No shading. Call anytime. Install within 1 month

07 Jun

Halstead (CO9)

Repair/Maintenance of Solar PV System

Maintenance of Solar PV installation

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue