- Compare up to 4 FREE quotes
- Get solar panels with 0% VAT
- Save up to £915 per year
Find Solar PV and Solar Thermal installers in Dunmow
First Solar PV Ltd
First Solar PV Ltd is an MCS certified installer of Solar Panel Systems, Membership number NAP 30063, and a member of RECC, Membership number 00070650.
Oakview, Leighams Road, Bicknacre, CM3 4HF
01245323911
Thunder Sparks Ltd
Thunder Sparks Solar - The premier level team.
16 Station Road, Billericay, CM12 9DP
03301220064
Green Energy Together
At Green Energy Together we take a refreshing approach towards renewable technology. We believe solar generation shouldn't be a luxury, it should be available(...)
8 Peerglow Centre, Marsh Lane, Ware, SG12 9QL
0203 995 4422
Green Energy Together Limited
We believe that solar shouldn’t be a luxury, it should be for everyone. Our solutions are designed to be simple, easy to understand, with no hidden costs or(...)
Unit 8 Peerglow Centre, Marsh Lane, Ware, SG12 9QL
02038669896
Chelsfield Electrical Ltd
Chelsfield Solar has been installing high-quality solar photovoltaic (PV) systems throughout the South East since 2002. Our highly experienced team provide a(...)
Van Hage Garden Centre, Pepper Hill, Great Amwell, SG12 9RP
01442 211766
Complete Renewables Ltd
With a reputation to be proud of and a very competitive installed price, Complete Renewables are well worth talking too. Selling top brand products with(...)
The Rookery, Chelmsford Road, Chelmsford, CM3 6PN
01621 827015
Nearby we also have installers in Stansted Braintree and Bishop's Stortford
Latest Job requests posted in Chelmsford
Chelmsford (CM2)
Repair/Maintenance of Solar PV System
Work Timescale: Within 3 Months.
Epping (CM16)
New Solar PV Installation
Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 6 Months.
Witham (CM8)
New Solar PV Installation with Battery
Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: None. Work Timescale: Within 3 Months.
Maldon (CM9)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Other. Shading: None. Work Timescale: Within 1 Year. Additional notes: pipe ar up to the roof.
Braintree (CM7)
New Solar PV Installation
Direction of roof: South West. Roof style: Other. Material: Tiled. Shading: None. System size required: open to advise. Work Timescale: ASAP. Additional notes:(...)
Bishop's Stortford (CM23)
New Battery Installation (Solar PV)
Current system size: 5kw. Current inverter: Micro Inverter. Battery location: loft. Work Timescale: ASAP.
Harlow (CM18)
New Battery Installation (Solar PV)
Current system size: economy seven//. Current inverter: Unsure. Battery location: open to advice/ electric cupboard. Work Timescale: ASAP.
Chelmsford (CM1)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 1 Year.
Brentwood (CM13)
New Solar PV Installation
Direction of roof: East. Roof style: Pitched/Angled. Work Timescale: ASAP. Material: Tiled. Shading: None. System size required: advice needed.
Bishop's Stortford (CM22)
New Solar PV Installation
Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: 40 panels. Work Timescale: Within 6(...)
Bishop's Stortford (CM22)
New Solar PV Installation
System required: Air to wet. Current Fuel Used: Gas. Age: 11 - 15 yrs. Number of Bedrooms: 4. Number of rooms: 6-10. Property Age: After 1980. Insulation:(...)
Chelmsford (CM2)
New Solar PV Installation
Current Fuel: Gas Current Boiler: Hot air system. Install ASAP. Contact anytime.
Chelmsford (CM1)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: Within 6(...)
Bishop's Stortford (CM23)
New Battery Installation (Solar PV)
Current system size: 3 KW. Current inverter: Unsure. Battery location: Garage. Work Timescale: Within 6 Months.
Braintree (CM77)
New Solar PV Installation
Direction of roof: Unsure. Roof style: Other. Material: Other. Shading: None. System size required: Open to suggestions. Work Timescale: ASAP. Additional notes:(...)
Witham (CM8)
New Solar Thermal Installation
Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 6 Months.
Bishop's Stortford (CM22)
New Solar PV Installation
Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: 6-7 KW. Work Timescale: ASAP.
Bishop's Stortford (CM23)
New Solar PV Installation
Direction of roof: North. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 6 Months.(...)
Maldon (CM9)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: Within 6(...)
Harlow (CM18)
New Solar PV Installation
Roof direction: Unsure. Pitched and tiled. No shading and some windows in the roof. Open to advice on the size of the system. Interested in discussing a battery(...)
Braintree (CM7)
New Solar PV Installation
Solar PV. Roof: West/East. Pitched and tiled. No real shading to affect panels. No windows on roof. Will speak to installer regarding size of system. Will(...)
Maldon (CM9)
New Solar PV Installation
Roof: South. Pitched and tiled. No Shading. Has 4 velux windows on the roof. Wants a 4-5kw system. Install ASAP. Contact anytime
Chelmsford (CM1)
New Solar Thermal Installation
Roof facing: South. Pitched and tiled. No shading. No windows. Open to advice on system size. There is a water cylinder. Install: 6 months. Contact anytime.
Witham (CM8)
New Solar PV Installation
Roof facing: North. Pitched and ashfelt tiles. No shading and no windows. Open to advice on system. Install within 6 months. Contact anytime.
Maldon (CM9)
New Solar PV Installation
Solar PV. East west facing roof. Pitched and tiled. No shading. No windows. Open to advise on system size. Work timescale with 6 months. Contact anytime.
Brentwood (CM15)
New Solar Thermal Installation
Supply and fit of Solar Thermal, Roof Faces East, Pitched and tiled. No windows, Timescale within 3 months. Contact anytime.
Ongar (CM5)
New Solar Thermal Installation
Solar Thermal. South facing roof. Pitched and tiled. No shading. No windows. Open to advise on system size. Work timescale with 3 months. Contact anytime.
Southminster (CM0)
Repair/Maintenance of Solar HW System
Repair of a 5 year old. 1 panel Solar Thermal installation. Inverter: unsure. Leaking. Repair ASAP. Contact: anytime
Chelmsford (CM3)
New Solar Thermal Installation
Roof: Unsure of direction. Pitched and Felt. No shading. No windows. Open to advice on the size of the system needed. Install ASAP. Contact Afternoons.
Maldon (CM9)
New Solar PV Installation
Roof: Unsure. Pitched and tiled. No windows. No shading. Would like to replace the old 10 panel system and open to advice on system. Replace within 1 month and(...)
Don't just take our word for it.
Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.