• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Dunmow

On average, our 6 Installers near Dunmow are rated: (4.23/5)
Order:

First Solar PV Ltd is an MCS certified installer of Solar Panel Systems, Membership number NAP 30063, and a member of RECC, Membership number 00070650.

location icon Oakview, Leighams Road, Bicknacre, CM3 4HF

phone icon01245323911

Thunder Sparks Solar - The premier level team.

location icon 16 Station Road, Billericay, CM12 9DP

phone icon03301220064

At Green Energy Together we take a refreshing approach towards renewable technology. We believe solar generation shouldn't be a luxury, it should be available(...)

location icon 8 Peerglow Centre, Marsh Lane, Ware, SG12 9QL

phone icon0203 995 4422

We believe that solar shouldn’t be a luxury, it should be for everyone. Our solutions are designed to be simple, easy to understand, with no hidden costs or(...)

location icon Unit 8 Peerglow Centre, Marsh Lane, Ware, SG12 9QL

phone icon02038669896

Chelsfield Solar has been installing high-quality solar photovoltaic (PV) systems throughout the South East since 2002. Our highly experienced team provide a(...)

location icon Van Hage Garden Centre, Pepper Hill, Great Amwell, SG12 9RP

phone icon01442 211766

With a reputation to be proud of and a very competitive installed price, Complete Renewables are well worth talking too. Selling top brand products with(...)

location icon The Rookery, Chelmsford Road, Chelmsford, CM3 6PN

phone icon01621 827015

On average, our 6 Installers near Dunmow are rated: (4.23/5)
Order:

location iconNearby we also have installers in Stansted Braintree and Bishop's Stortford

Latest Job requests posted in Chelmsford

26 Apr

Chelmsford (CM2)

Repair/Maintenance of Solar PV System

Work Timescale: Within 3 Months.

09 Apr

Epping (CM16)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 6 Months.

24 Oct

Witham (CM8)

New Solar PV Installation with Battery

Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: None. Work Timescale: Within 3 Months.

24 Oct

Maldon (CM9)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Other. Shading: None. Work Timescale: Within 1 Year. Additional notes: pipe ar up to the roof.

18 May

Braintree (CM7)

New Solar PV Installation

Direction of roof: South West. Roof style: Other. Material: Tiled. Shading: None. System size required: open to advise. Work Timescale: ASAP. Additional notes:(...)

21 Feb

Bishop's Stortford (CM23)

New Battery Installation (Solar PV)

Current system size: 5kw. Current inverter: Micro Inverter. Battery location: loft. Work Timescale: ASAP.

19 Oct

Harlow (CM18)

New Battery Installation (Solar PV)

Current system size: economy seven//. Current inverter: Unsure. Battery location: open to advice/ electric cupboard. Work Timescale: ASAP.

10 Sep

Chelmsford (CM1)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 1 Year.

05 Jul

Brentwood (CM13)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Work Timescale: ASAP. Material: Tiled. Shading: None. System size required: advice needed.

27 May

Bishop's Stortford (CM22)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: 40 panels. Work Timescale: Within 6(...)

31 Mar

Bishop's Stortford (CM22)

New Solar PV Installation

System required: Air to wet. Current Fuel Used: Gas. Age: 11 - 15 yrs. Number of Bedrooms: 4. Number of rooms: 6-10. Property Age: After 1980. Insulation:(...)

26 Feb

Chelmsford (CM2)

New Solar PV Installation

Current Fuel: Gas Current Boiler: Hot air system. Install ASAP. Contact anytime.

23 Feb

Chelmsford (CM1)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: Within 6(...)

03 Feb

Bishop's Stortford (CM23)

New Battery Installation (Solar PV)

Current system size: 3 KW. Current inverter: Unsure. Battery location: Garage. Work Timescale: Within 6 Months.

11 Oct

Braintree (CM77)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Other. Material: Other. Shading: None. System size required: Open to suggestions. Work Timescale: ASAP. Additional notes:(...)

07 Oct

Witham (CM8)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 6 Months.

06 Oct

Bishop's Stortford (CM22)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: 6-7 KW. Work Timescale: ASAP.

22 Sep

Bishop's Stortford (CM23)

New Solar PV Installation

Direction of roof: North. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 6 Months.(...)

17 Aug

Maldon (CM9)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: Within 6(...)

13 Jun

Harlow (CM18)

New Solar PV Installation

Roof direction: Unsure. Pitched and tiled. No shading and some windows in the roof. Open to advice on the size of the system. Interested in discussing a battery(...)

11 Jun

Braintree (CM7)

New Solar PV Installation

Solar PV. Roof: West/East. Pitched and tiled. No real shading to affect panels. No windows on roof. Will speak to installer regarding size of system. Will(...)

13 Oct

Maldon (CM9)

New Solar PV Installation

Roof: South. Pitched and tiled. No Shading. Has 4 velux windows on the roof. Wants a 4-5kw system. Install ASAP. Contact anytime

02 Oct

Chelmsford (CM1)

New Solar Thermal Installation

Roof facing: South. Pitched and tiled. No shading. No windows. Open to advice on system size. There is a water cylinder. Install: 6 months. Contact anytime.

01 Mar

Witham (CM8)

New Solar PV Installation

Roof facing: North. Pitched and ashfelt tiles. No shading and no windows. Open to advice on system. Install within 6 months. Contact anytime.

25 Sep

Maldon (CM9)

New Solar PV Installation

Solar PV. East west facing roof. Pitched and tiled. No shading. No windows. Open to advise on system size. Work timescale with 6 months. Contact anytime.

09 Jul

Brentwood (CM15)

New Solar Thermal Installation

Supply and fit of Solar Thermal, Roof Faces East, Pitched and tiled. No windows, Timescale within 3 months. Contact anytime.

04 Jun

Ongar (CM5)

New Solar Thermal Installation

Solar Thermal. South facing roof. Pitched and tiled. No shading. No windows. Open to advise on system size. Work timescale with 3 months. Contact anytime.

10 Apr

Southminster (CM0)

Repair/Maintenance of Solar HW System

Repair of a 5 year old. 1 panel Solar Thermal installation. Inverter: unsure. Leaking. Repair ASAP. Contact: anytime

19 Mar

Chelmsford (CM3)

New Solar Thermal Installation

Roof: Unsure of direction. Pitched and Felt. No shading. No windows. Open to advice on the size of the system needed. Install ASAP. Contact Afternoons.

06 Mar

Maldon (CM9)

New Solar PV Installation

Roof: Unsure. Pitched and tiled. No windows. No shading. Would like to replace the old 10 panel system and open to advice on system. Replace within 1 month and(...)

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue