- Compare up to 4 FREE quotes
- Get solar panels with 0% VAT
- Save up to £915 per year
Find Solar PV and Solar Thermal installers in Hockley
Electrical Farm Services Ltd
EFS Ltd is a Solar PV and Electrical contracting company established since 1971. We install, design and maintain Solar PV systems from 1KW domestic to 1(...)
2 Hillybroom Gardens, West Mersea, Colchester, CO5 8UG
01206386965
EcoSmart Electrical & Renewables
Specialist in Low Carbon and Renewable technology installations, creating whole home and business solutions.
9 Cornwall Road, Rochester, ME1 3DR
07896871481
Nearby we also have installers in Rayleigh Rochford and Leigh-On-Sea
Latest Job requests posted in Southend-On-Sea
Canvey Island (SS8)
New Solar PV Installation
Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP.
Basildon (SS14)
New Solar Thermal Installation
Direction of roof: Unsure. Material: Tiled. Roof style: Pitched/Angled. Work Timescale: Within 3 Months. Shading: None. Windows on roof: No.
Benfleet (SS7)
New Solar Thermal Installation
Direction of roof: East. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 1 Year.
Leigh-on-Sea (SS9)
Repair/Maintenance of Solar PV System
Current system size: 20 panels. Work Timescale: ASAP.
Leigh-on-Sea (SS9)
Repair/Maintenance of Solar PV System
Current Fuel Used: Gas. Current system: potterton. Age: Up to 5 yrs. Condition: Working. Location: loft-keep. Work Timescale: Within 3 Months.
Basildon (SS16)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: ASAP.
Canvey Island (SS8)
New Solar PV Installation
Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Other. Work Timescale: Within 3 Months. Shading: None. System size required: Open to advice.(...)
Benfleet (SS7)
New Battery Installation (Solar PV)
Current system size: 3.5KW - 16 panels. Current inverter: Transco. Battery location: Possibly the loft space. Work Timescale: Within 6 Months. Additional(...)
Southend-on-Sea (SS2)
New Solar PV Installation
Supply and fit of Solar PV and battery. west facing roof, pitched and tiled, no shading, no windows in the roof Timescale ASAP. Contact anytime up to 8pm
Basildon (SS16)
New Solar Thermal Installation
Roof facing: East/West. Pitched and tiled. No shading. No windows. Open to advice on system size.Has a hot water cylinder. Install: ASAP. Contact anytime.
Basildon (SS14)
New Solar PV Installation
Roof: flat and steel. No shading. No windows. Size system: open to advice. Install ASAP. Contact:anytime.
Southend-on-Sea (SS3)
New Solar PV Installation
**Property not yet built - drawings available on request* Will be a detached house. Roof direction: east/west. Pitched tiled. No shading. No windows. Open to(...)
Stanford-le-Hope (SS17)
Repair/Maintenance of Solar PV System
Current PV size: 4kw. Customer is looking for panels to be serviced and a safety certificate to be produced. Would like this doing within 3 months. Contact(...)
Hockley (SS5)
Repair/Maintenance of Solar PV System
Customer would like 4 panels to be moved. Would like the work to be completed ASAP. Contact anytime.
Southend-on-Sea (SS1)
Repair/Maintenance of Solar PV System
Solar edge HD wave inverter believed to be malfunctioning. Repair: asap Contact: anytime
Rayleigh (SS6)
New Solar PV Installation
Roof: South facing. Pitched and tiled. No shading. Dorma windows on roof. Wants 8 panels. Install within 3 months or sooner. Contact PM
Stanford-le-Hope (SS17)
Repair/Maintenance of Solar PV System
Yearly service/maintenance of my solar photovoltaic system, 3 panels. Maintenance: asap. Contact: anytime
Southend-on-Sea (SS3)
New Solar Thermal Installation
Solar thermal system required. South facing. Pitched and tiled. No shading to affect panels, detached house. No windows on the roof. Would like to discuss size(...)
Canvey Island (SS8)
Repair/Maintenance of Solar HW System
we moved into the above address recently and we do know how to turn on the solar panel on with the programmer "solareg " 2 system
Westcliff-on-Sea (SS0)
New Solar Thermal Installation
Thermal & PV quote. The house has 3 bedrooms, would like to run underfloor heating downstairs and possible radiators upstairs. (elec boiler or suggestions). To(...)
Basildon (SS15)
New Solar PV Installation
Solar PV. Roof: South facing. Pitched and tiled. No shading. No windows on the roof. 4kw system. Install within 1 month. Contact anytime. Appointments anytime.
Basildon (SS15)
New Solar PV Installation
New installation had a couple of quotes for 10 or 12 panel install on a south faces roof.
Rochford (SS4)
New Solar PV Installation
This is a boat. We would like solar panels to cover the wheelhouse approximately 3 x 3m. Call anytime. Install within 3 months. Appointments: evenings and(...)
Southend-on-Sea (SS3)
New Solar PV Installation
** and are away from 17/06/15 so please only respond if you can quote before then ** Solar PV . Roof: south facing. Pitch and tiled. No shading . No windows(...)
Leigh-on-Sea (SS9)
New Solar PV Installation
The house is a four bedroom with a standard, pitched, tiled roof, although an extension is a flat roof. Roof is facing in 4 directions. No windows. No shading.(...)
Basildon (SS16)
New Solar PV Installation
South west facing, pitched, tiled roof. No shading on roof. Had 1 quote so far. Open to suggestions on system size. Would like the work to be done ASAP.(...)
Leigh-on-Sea (SS9)
New Solar PV Installation
Solar PV. Roof:South west facing. Pitched and tiled. shading from large oak trees. No windows on the roof. 4kw system. Install within 1 month. Contact anytime.(...)
Rayleigh (SS6)
New Solar PV Installation
4 bed detached. Roof: south/south west. Solar PV system for tiled roof - approximate dimensions 9 x 2.8 metres, 23 degrees pitch, 213 degrees azimuth. No(...)
Westcliff-on-Sea (SS0)
New Solar PV Installation
South facing, pitched, tiled roof. Detached house. Balcony in roof. Patio door in roof. Probably 9 panels. Timescale: within 1 month. Contact anytime.(...)
Southend-on-Sea (SS1)
New Solar PV Installation
3 way split on an end of terrace, roofs face east,south and west. Pitched and tiled, no windows, slight shading from a chimney pot and tree in the summer.(...)
Don't just take our word for it.
Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.