• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Southend-On-Sea

On average, our 3 Installers near Southend-On-Sea are rated: (4.36/5)
Order:

EFS Ltd is a Solar PV and Electrical contracting company established since 1971. We install, design and maintain Solar PV systems from 1KW domestic to 1(...)

location icon 2 Hillybroom Gardens, West Mersea, Colchester, CO5 8UG

phone icon01206386965

At Array Electrics, we know that a safe and well-functioning electrical system is crucial for your home. Our team of expert electricians is dedicated to(...)

location icon 7 Drakes Lane Industrial Estate, Drakes Lane, Chelmsford, CM3 3BE

phone icon07877452710

KVB Renewables are Gas Safe accredited and based in Gravesend.

location icon Unit 5, Bowes Industrial Centre, Gravesend, DA13 0QB

phone icon0800 368 5245

On average, our 3 Installers near Southend-On-Sea are rated: (4.36/5)
Order:

location iconNearby we also have installers in Westcliff-On-Sea Leigh-On-Sea and Rochford

Latest Job requests posted in Southend-On-Sea

17 Jan

Canvey Island (SS8)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP.

31 Dec

Basildon (SS14)

New Solar Thermal Installation

Direction of roof: Unsure. Material: Tiled. Roof style: Pitched/Angled. Work Timescale: Within 3 Months. Shading: None. Windows on roof: No.

29 Dec

Benfleet (SS7)

New Solar Thermal Installation

Direction of roof: East. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 1 Year.

02 Jul

Leigh-on-Sea (SS9)

Repair/Maintenance of Solar PV System

Current system size: 20 panels. Work Timescale: ASAP.

30 Jun

Leigh-on-Sea (SS9)

Repair/Maintenance of Solar PV System

Current Fuel Used: Gas. Current system: potterton. Age: Up to 5 yrs. Condition: Working. Location: loft-keep. Work Timescale: Within 3 Months.

02 Nov

Basildon (SS16)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: ASAP.

22 Sep

Canvey Island (SS8)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Other. Work Timescale: Within 3 Months. Shading: None. System size required: Open to advice.(...)

30 Jun

Benfleet (SS7)

New Battery Installation (Solar PV)

Current system size: 3.5KW - 16 panels. Current inverter: Transco. Battery location: Possibly the loft space. Work Timescale: Within 6 Months. Additional(...)

11 May

Southend-on-Sea (SS2)

New Solar PV Installation

Supply and fit of Solar PV and battery. west facing roof, pitched and tiled, no shading, no windows in the roof Timescale ASAP. Contact anytime up to 8pm

29 Feb

Basildon (SS16)

New Solar Thermal Installation

Roof facing: East/West. Pitched and tiled. No shading. No windows. Open to advice on system size.Has a hot water cylinder. Install: ASAP. Contact anytime.

26 Feb

Basildon (SS14)

New Solar PV Installation

Roof: flat and steel. No shading. No windows. Size system: open to advice. Install ASAP. Contact:anytime.

05 Feb

Southend-on-Sea (SS3)

New Solar PV Installation

**Property not yet built - drawings available on request* Will be a detached house. Roof direction: east/west. Pitched tiled. No shading. No windows. Open to(...)

21 Feb

Stanford-le-Hope (SS17)

Repair/Maintenance of Solar PV System

Current PV size: 4kw. Customer is looking for panels to be serviced and a safety certificate to be produced. Would like this doing within 3 months. Contact(...)

18 Sep

Hockley (SS5)

Repair/Maintenance of Solar PV System

Customer would like 4 panels to be moved. Would like the work to be completed ASAP. Contact anytime.

09 Aug

Southend-on-Sea (SS1)

Repair/Maintenance of Solar PV System

Solar edge HD wave inverter believed to be malfunctioning. Repair: asap Contact: anytime

07 Aug

Rayleigh (SS6)

New Solar PV Installation

Roof: South facing. Pitched and tiled. No shading. Dorma windows on roof. Wants 8 panels. Install within 3 months or sooner. Contact PM

19 Jun

Stanford-le-Hope (SS17)

Repair/Maintenance of Solar PV System

Yearly service/maintenance of my solar photovoltaic system, 3 panels. Maintenance: asap. Contact: anytime

07 May

Southend-on-Sea (SS3)

New Solar Thermal Installation

Solar thermal system required. South facing. Pitched and tiled. No shading to affect panels, detached house. No windows on the roof. Would like to discuss size(...)

19 Jan

Canvey Island (SS8)

Repair/Maintenance of Solar HW System

we moved into the above address recently and we do know how to turn on the solar panel on with the programmer "solareg " 2 system

13 Nov

Westcliff-on-Sea (SS0)

New Solar Thermal Installation

Thermal & PV quote. The house has 3 bedrooms, would like to run underfloor heating downstairs and possible radiators upstairs. (elec boiler or suggestions). To(...)

02 Sep

Basildon (SS15)

New Solar PV Installation

Solar PV. Roof: South facing. Pitched and tiled. No shading. No windows on the roof. 4kw system. Install within 1 month. Contact anytime. Appointments anytime.

24 Aug

Basildon (SS15)

New Solar PV Installation

New installation had a couple of quotes for 10 or 12 panel install on a south faces roof.

24 Jun

Rochford (SS4)

New Solar PV Installation

This is a boat. We would like solar panels to cover the wheelhouse approximately 3 x 3m. Call anytime. Install within 3 months. Appointments: evenings and(...)

08 Jun

Southend-on-Sea (SS3)

New Solar PV Installation

** and are away from 17/06/15 so please only respond if you can quote before then ** Solar PV . Roof: south facing. Pitch and tiled. No shading . No windows(...)

04 Jun

Leigh-on-Sea (SS9)

New Solar PV Installation

The house is a four bedroom with a standard, pitched, tiled roof, although an extension is a flat roof. Roof is facing in 4 directions. No windows. No shading.(...)

09 Apr

Basildon (SS16)

New Solar PV Installation

South west facing, pitched, tiled roof. No shading on roof. Had 1 quote so far. Open to suggestions on system size. Would like the work to be done ASAP.(...)

18 Mar

Leigh-on-Sea (SS9)

New Solar PV Installation

Solar PV. Roof:South west facing. Pitched and tiled. shading from large oak trees. No windows on the roof. 4kw system. Install within 1 month. Contact anytime.(...)

30 Jan

Rayleigh (SS6)

New Solar PV Installation

4 bed detached. Roof: south/south west. Solar PV system for tiled roof - approximate dimensions 9 x 2.8 metres, 23 degrees pitch, 213 degrees azimuth. No(...)

01 Jan

Westcliff-on-Sea (SS0)

New Solar PV Installation

South facing, pitched, tiled roof. Detached house. Balcony in roof. Patio door in roof. Probably 9 panels. Timescale: within 1 month. Contact anytime.(...)

30 Nov

Southend-on-Sea (SS1)

New Solar PV Installation

3 way split on an end of terrace, roofs face east,south and west. Pitched and tiled, no windows, slight shading from a chimney pot and tree in the summer.(...)

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue