- Compare up to 4 FREE quotes
- Get solar panels with 0% VAT
- Save up to £915 per year
Find Solar PV and Solar Thermal installers in Hemel Hempstead
Green Energy Together Limited
We believe that solar shouldn’t be a luxury, it should be for everyone. Our solutions are designed to be simple, easy to understand, with no hidden costs or(...)
Unit 8 Peerglow Centre,
Marsh Lane,
Ware,
SG12 9QL
02038669896

Chelsfield Electrical Ltd
Chelsfield Solar has been installing high-quality solar photovoltaic (PV) systems throughout the South East since 2002. Our highly experienced team provide a(...)
Van Hage Garden Centre,
Pepper Hill,
Great Amwell,
SG12 9RP
01442 211766


Nearby we also have installers in
Kings Langley
Berkhamsted
and Abbots Langley
Latest Job requests posted in Hemel Hempstead
High Wycombe (HP14)
New Battery Installation (Solar PV)
Current system size: Not Sure. Current inverter: Other. Battery location: Open to Advice. Work Timescale: Within 6 Months.
Aylesbury (HP22)
New Solar PV Installation with Battery
Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby building. Work Timescale: Within 3 Months.
High Wycombe (HP12)
New Battery Installation (Solar PV)
Direction of roof: . Roof style: . Material: . Shading: . System size required: . Work Timescale: ASAP. Additional notes: .
High Wycombe (HP14)
New Solar PV Installation
Direction of roof: Multiple. Roof style: Multiple. Material: Tiled. Shading: None. Work Timescale: Within 3 Months.
Hemel Hempstead (HP3)
New Solar PV Installation
Work Timescale: Within 6 Months.
Princes Risborough (HP27)
New Battery Installation (Solar PV)
Work Timescale: Within 3 Months.
Aylesbury (HP21)
New Battery Installation (Solar PV)
Current system size: 16 panels - 10kw. Current inverter: unsure. Battery location: loft. Work Timescale: Within 1 Month. Additional notes: REQUIRES: "Pure(...)
High Wycombe (HP13)
New Solar Thermal Installation
Direction of roof: South. Material: Unsure. Roof style: Flat. Shading: None. Windows on roof: No. Work Timescale: Within 3 Months. Additional notes: renovations(...)
Hemel Hempstead (HP2)
New Solar PV Installation
Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: None. System size required: open to advise. Work Timescale: ASAP. Additional notes:(...)
Beaconsfield (HP9)
New Solar PV Installation
Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby building. System size required: 15 Monocrystalline panels. Work(...)
Chesham (HP5)
New Solar PV Installation
Work Timescale: Within 6 Months.
Aylesbury (HP21)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 6 Months.
Aylesbury (HP22)
New Solar Thermal Installation
Direction of roof: South East. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 6 Months.
High Wycombe (HP13)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP.
Tring (HP23)
New Battery Installation (Solar PV)
Current system size: 3800kw per year. Current inverter: Solis 3600. Battery location: Open to advice/possibly loft or under the stairs. Work Timescale: ASAP.
Hemel Hempstead (HP3)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Additional notes: Flat roof(...)
Chalfont St. Giles (HP8)
New Solar PV Installation
Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to Advice. Work Timescale: Within 3(...)
Hemel Hempstead (HP3)
New Solar Thermal Installation
Direction of roof: Unsure. Material: Unsure. Roof style: Flat. Shading: None. Windows on roof: No. Work Timescale: Within 3 Months. Additional notes: **drawings(...)
Chesham (HP5)
New Solar PV Installation
Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice, 5kw. Work Timescale: Within 3(...)
Chesham (HP5)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: ASAP.
Aylesbury (HP21)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 6kw. Work Timescale: Within 3 Months.
Beaconsfield (HP9)
New Solar PV Installation
Current Fuel Used: Gas. Number of Bedrooms: 5+. Number of rooms: 11-15. Property Age: After 1980. Insulation: Loft & Cavity wall. Windows: Double glazing. Work(...)
Tring (HP23)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Work Timescale: ASAP. Shading: Yes - Other. System size required: open to advice.(...)
Princes Risborough (HP27)
New Solar PV Installation
Direction of roof: South East. Roof style: Pitched/Angled. Material: Unsure. Shading: None. System size required: open to advice. Work Timescale: Within 1(...)
Hemel Hempstead (HP2)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: ASAP.
Aylesbury (HP22)
New Solar Thermal Installation
Direction of roof: South West. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 1 Month.
Hemel Hempstead (HP1)
New Solar PV Installation
Direction of roof: North. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within ASAP.
Amersham (HP6)
New Solar PV Installation
System required: Air to wet. Current Fuel Used: Gas. Age: 6 - 10 yrs. Number of Bedrooms: 4. Number of rooms: 6-10. Property Age:(...)
High Wycombe (HP13)
New Solar PV Installation
Direction of roof: Unsure. Roof style: Flat. Material: Other. Shading: None. System size required: Open to advice depending on what's feasible. Work Timescale:(...)
High Wycombe (HP12)
New Solar Thermal Installation
Direction of roof: Unsure. Material: Tiled. Roof style: Pitched/Angled. Shading: Yes - Nearby tree. Windows on roof: Yes. Work Timescale: ASAP.
Don't just take our word for it.
Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.
