- Compare up to 4 FREE quotes
- Get solar panels with 0% VAT
- Save up to £915 per year
Find Solar PV and Solar Thermal installers in Sawbridgeworth
Array Electrics Limited
At Array Electrics, we know that a safe and well-functioning electrical system is crucial for your home. Our team of expert electricians is dedicated to(...)
7 Drakes Lane Industrial Estate, Drakes Lane, Chelmsford, CM3 3BE
07877452710
Think Green Partners
Specialist in all renewable aspects including Solar PV, Battery Storage and Air Source Heat Pumps. We are RHI installer of the year for the South East region(...)
Queen Court, 9-17 Eastern Road, Romford, RM1 3NH
07736740237
Thunder Sparks Ltd
Thunder Sparks Solar - The premier level team.
16 Station Road, Billericay, CM12 9DP
03301220064
Solinvictus Ltd
Solinvictus are a St Albans based solar PV and solar thermal specialist.
Unit B3, 156 St Albans Road Industrial Estate,, 156 St Albans Road, St. Albans, AL4 9LP
01727840555
Carmichael Browns Renewable Energy
Carmichael-Browns Renewable Energy has nearly 30 of experience in a wide range of design, installation and maintenance projects. These include Solar PV, Air(...)
Becquerel Centre, Knole Cottage, Chelmsford, CM3 4RY
01245 227100
Athena Electrical Ltd
Women owned and operated, Athena Electrical has over 20 years of experience in the electrical contracting industry. Our strength lies in technical expertise(...)
190, Evering Road, London, E5 8AJ
020 7503 6211
Nearby we also have installers in Harlow Bishop's Stortford and Much Hadham
Latest Job requests posted in Chelmsford
Chelmsford (CM2)
Repair/Maintenance of Solar PV System
Work Timescale: Within 3 Months.
Epping (CM16)
New Solar PV Installation
Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 6 Months.
Witham (CM8)
New Solar PV Installation with Battery
Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: None. Work Timescale: Within 3 Months.
Maldon (CM9)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Other. Shading: None. Work Timescale: Within 1 Year. Additional notes: pipe ar up to the roof.
Braintree (CM7)
New Solar PV Installation
Direction of roof: South West. Roof style: Other. Material: Tiled. Shading: None. System size required: open to advise. Work Timescale: ASAP. Additional notes:(...)
Bishop's Stortford (CM23)
New Battery Installation (Solar PV)
Current system size: 5kw. Current inverter: Micro Inverter. Battery location: loft. Work Timescale: ASAP.
Harlow (CM18)
New Battery Installation (Solar PV)
Current system size: economy seven//. Current inverter: Unsure. Battery location: open to advice/ electric cupboard. Work Timescale: ASAP.
Chelmsford (CM1)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 1 Year.
Brentwood (CM13)
New Solar PV Installation
Direction of roof: East. Roof style: Pitched/Angled. Work Timescale: ASAP. Material: Tiled. Shading: None. System size required: advice needed.
Bishop's Stortford (CM22)
New Solar PV Installation
Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: 40 panels. Work Timescale: Within 6(...)
Bishop's Stortford (CM22)
New Solar PV Installation
System required: Air to wet. Current Fuel Used: Gas. Age: 11 - 15 yrs. Number of Bedrooms: 4. Number of rooms: 6-10. Property Age: After 1980. Insulation:(...)
Chelmsford (CM2)
New Solar PV Installation
Current Fuel: Gas Current Boiler: Hot air system. Install ASAP. Contact anytime.
Chelmsford (CM1)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: Within 6(...)
Bishop's Stortford (CM23)
New Battery Installation (Solar PV)
Current system size: 3 KW. Current inverter: Unsure. Battery location: Garage. Work Timescale: Within 6 Months.
Braintree (CM77)
New Solar PV Installation
Direction of roof: Unsure. Roof style: Other. Material: Other. Shading: None. System size required: Open to suggestions. Work Timescale: ASAP. Additional notes:(...)
Witham (CM8)
New Solar Thermal Installation
Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 6 Months.
Bishop's Stortford (CM22)
New Solar PV Installation
Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: 6-7 KW. Work Timescale: ASAP.
Bishop's Stortford (CM23)
New Solar PV Installation
Direction of roof: North. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 6 Months.(...)
Maldon (CM9)
New Solar PV Installation
Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: Within 6(...)
Harlow (CM18)
New Solar PV Installation
Roof direction: Unsure. Pitched and tiled. No shading and some windows in the roof. Open to advice on the size of the system. Interested in discussing a battery(...)
Braintree (CM7)
New Solar PV Installation
Solar PV. Roof: West/East. Pitched and tiled. No real shading to affect panels. No windows on roof. Will speak to installer regarding size of system. Will(...)
Maldon (CM9)
New Solar PV Installation
Roof: South. Pitched and tiled. No Shading. Has 4 velux windows on the roof. Wants a 4-5kw system. Install ASAP. Contact anytime
Chelmsford (CM1)
New Solar Thermal Installation
Roof facing: South. Pitched and tiled. No shading. No windows. Open to advice on system size. There is a water cylinder. Install: 6 months. Contact anytime.
Witham (CM8)
New Solar PV Installation
Roof facing: North. Pitched and ashfelt tiles. No shading and no windows. Open to advice on system. Install within 6 months. Contact anytime.
Maldon (CM9)
New Solar PV Installation
Solar PV. East west facing roof. Pitched and tiled. No shading. No windows. Open to advise on system size. Work timescale with 6 months. Contact anytime.
Brentwood (CM15)
New Solar Thermal Installation
Supply and fit of Solar Thermal, Roof Faces East, Pitched and tiled. No windows, Timescale within 3 months. Contact anytime.
Ongar (CM5)
New Solar Thermal Installation
Solar Thermal. South facing roof. Pitched and tiled. No shading. No windows. Open to advise on system size. Work timescale with 3 months. Contact anytime.
Southminster (CM0)
Repair/Maintenance of Solar HW System
Repair of a 5 year old. 1 panel Solar Thermal installation. Inverter: unsure. Leaking. Repair ASAP. Contact: anytime
Chelmsford (CM3)
New Solar Thermal Installation
Roof: Unsure of direction. Pitched and Felt. No shading. No windows. Open to advice on the size of the system needed. Install ASAP. Contact Afternoons.
Maldon (CM9)
New Solar PV Installation
Roof: Unsure. Pitched and tiled. No windows. No shading. Would like to replace the old 10 panel system and open to advice on system. Replace within 1 month and(...)
Don't just take our word for it.
Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.