• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Tonbridge

On average, our 4 Installers near Tonbridge are rated: (4.44/5)
Order:

L&C Installations was established in 1997 and provides a range of electrical services from domestic wiring, installation and testing to commercial power and(...)

location icon 92 Kingsley Road, Horley, RH6 8AW

phone icon01293 415740

TRUSTED LOCAL INSTALLER Fairway Traders Ltd ARE ACCREDITED BY GAS SAFE AND SPECIALISE IN SOLAR PV, THEY ARE BASED IN WEST SUSSEX.

location icon 12 St. Catherines Road, Crawley, RH10 3TA

phone icon07429699577

Solid Electrical has over a decade of experience of installation and maintenance of solar PV systems.

location icon 123 Capital Business Centre, Calrton Road, South Croydon, CR2 0BS

phone icon08000614600

Pure Energy are a market leading renewable energy company based across the UK installing a wide range of award-winning products.

location icon The Old Courthouse, Orsett Road, Grays, RM17 5DD

phone icon02039363785

On average, our 4 Installers near Tonbridge are rated: (4.44/5)
Order:

location iconNearby we also have installers in Tunbridge Wells Sevenoaks and West Malling

Latest Job requests posted in Tonbridge

11 Oct

Uckfield (TN22)

New Solar PV Installation with Battery

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 3 Months.

22 Jul

Uckfield (TN22)

New Solar PV Installation - Remote Quote

Work Timescale: Within 1 Month. Property Ownership: Property Owner.

02 May

Cranbrook (TN17)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: . Work Timescale: Within 3 Months. Additional(...)

01 Mar

Cranbrook (TN18)

New Battery Installation (Solar PV)

Current system size: 3.9kw. Current inverter: Solex. Battery location: coalhouse wall. Work Timescale: Within 1 Month.

20 Jan

Etchingham (TN19)

Repair/Maintenance of Solar PV System

Current system size: 31. Work Timescale: ASAP.

25 Nov

Sevenoaks (TN15)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advise. Work Timescale: ASAP.

17 Nov

Tonbridge (TN12)

New Battery Installation (Solar PV)

Current system size: 4KW. Current inverter: Solar Edge. Battery location: Garage. Work Timescale: Within 3 Months.

20 Oct

Uckfield (TN22)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Other. Shading: None. System size required: Open to advice. Work Timescale: Within 3 Months.

12 Oct

Tunbridge Wells (TN3)

New Solar PV Installation

Looking to replace a Gas boiler with an electric one

06 Sep

Uckfield (TN22)

New Solar PV Installation

Work Timescale: ASAP.

23 Aug

Ashford (TN25)

New Solar PV Installation

System required: Air to wet. Current Fuel Used: Gas. Age: Up to 5 yrs. Number of Bedrooms: 5. Number of rooms: 6-10. Property Age: After 1980. Insulation: Loft(...)

23 Aug

Tonbridge (TN11)

New Solar PV Installation

Direction of roof: West. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby building. System size required: open to advice. Work Timescale:(...)

17 Aug

Rye (TN31)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 3 Months.(...)

15 Aug

Tunbridge Wells (TN2)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Other. Shading: None. System size required: Open to advice. Work Timescale: ASAP.

10 Aug

Tonbridge (TN12)

New Solar Thermal Installation

Direction of roof: East. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 6 Months.

29 Jun

Uckfield (TN22)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP.

17 Jun

Bexhill-on-Sea (TN39)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP.

23 May

Crowborough (TN6)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: advice required. Work Timescale: ASAP.

17 May

Cranbrook (TN18)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Other. Work Timescale: Within 3 Months.

09 May

Wadhurst (TN5)

Repair/Maintenance of Solar HW System

Current system size: 4kWh (17 panels). Work Timescale: Within 1 Month.

29 Apr

Hastings (TN34)

New Solar PV Installation

Direction of roof: South. Roof style: Flat. Material: Other. Shading: None. System size required: Open to advice. Work Timescale: Within 3 Months.

20 Apr

Tenterden (TN30)

New Battery Installation (Solar PV)

Current system size: 4kw. Current inverter: sunny boy. Battery location: outhouse. Work Timescale: Within 1 Month.

08 Mar

Bexhill-on-Sea (TN39)

New Battery Installation (Solar PV)

Current system size: Unsure. Current inverter: Unsure. Battery location: Garage. Work Timescale: Within 3 Months.

07 Mar

Ashford (TN24)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 3(...)

28 Feb

Cranbrook (TN17)

New Solar PV Installation

Replacing an old heating system. Interested in electric boiler system + solar panels

20 Feb

Crowborough (TN6)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Other. System size required: 16 panels - 6kw. Work Timescale: ASAP.

04 Feb

Ashford (TN24)

New Solar PV Installation

Direction of roof: South. Roof style: Other. Material: Tiled. Shading: None. System size required: 3.7-4 kw. Work Timescale: Within 3 Months.

30 Jan

Sevenoaks (TN14)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Other. Shading: None. System size required: open to advice. Work Timescale: Within 3 Months. Additional(...)

26 Jan

Ashford (TN27)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: Yes - Nearby tree. System size required: be advised. Work Timescale: Within 3 Months.(...)

26 Jan

Sevenoaks (TN14)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 6 Months.

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue