• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Horsham

On average, our 2 Installers near Horsham are rated: (4.53/5)
Order:

Solar panel installations
Battery Storage solutions
EV Charging stations
We are a family run business that's has been established for over 20 years.
We design(...)

location icon 25 Beacon Way, Littlehampton, BN17 6QS

phone icon01903 734817

SAS Home Heat has been formed to service SAS Energy’s existing and new domestic customers for all their plumbing, heating and renewable energy needs.

location icon Unit 9, Edenbridge Trade Centre, Edenbridge, TN8 5EA

phone icon01732 247006

On average, our 2 Installers near Horsham are rated: (4.53/5)
Order:

location iconNearby we also have installers in Billingshurst Crawley and Gatwick

Latest Job requests posted in Redhill

10 Jun

Redhill (RH1)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Other. Shading: None. Work Timescale: Within 3 Months.

10 Apr

Billingshurst (RH14)

New Solar PV Installation - Remote Quote

Work Timescale: Within 1 Month. Additional notes: move in on the 19th of April.

10 Feb

Horsham (RH12)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 6 Months.

06 Dec

OXTED (RH8)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 6 Months.

24 Oct

Billingshurst (RH14)

New Solar PV Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Work Timescale: Within 3 Months.

25 Aug

Burgess Hill (RH15)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: None. System size required: 12 kwatts. Work Timescale: Within 6 Months. Additional(...)

19 Jul

East Grinstead (RH19)

Solar PV Battery (Repair/Maintenance)

Current system size: 12 panels. Current system: Samsung. Work Timescale: ASAP.

12 May

Oxted (RH8)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Take Advice. Work Timescale: Within 3 Months.(...)

15 Dec

Reigate (RH2)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 3(...)

16 Nov

Horsham (RH13)

New Solar PV Installation

Direction of roof: South. Roof style: Other. Material: Other. Shading: None. System size required: advice needed. Work Timescale: ASAP. Additional notes: alt.(...)

10 Oct

Pulborough (RH20)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: ASAP. Additional(...)

05 Oct

Pulborough (RH20)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: ASAP. Additional(...)

24 Aug

Burgess Hill (RH15)

New Solar PV Installation

Current Fuel Used: Gas. Number of Bedrooms: 5+. Required location: advice needed. Number of rooms: 11-15. Property Age: After 1980. Insulation: Loft & Cavity(...)

19 Aug

Lingfield (RH7)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 1 Year.(...)

16 Aug

Horley (RH6)

New Battery Installation (Solar PV)

Current system size: 1.28kw. Current inverter: unsure. Battery location: open to advice. Work Timescale: Within 3 Months.

16 Aug

Horley (RH6)

New Solar Thermal Installation

Direction of roof: South West. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 3 Months.

04 Aug

Crawley (RH10)

New Solar PV Installation

Current Fuel Used: Oil.

03 Aug

Crawley (RH10)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: open to advice. Work Timescale: ASAP.

25 May

Redhill (RH1)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 6 Months.

18 May

Horsham (RH13)

New Battery Installation (Solar PV)

Current system size: 4kW X 2 systems. Current inverter: unknown. Battery location: Open to suggestions. Work Timescale: ASAP.

28 Apr

Horsham (RH12)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: None. System size required: Open to suggestions. Work Timescale: Within 6 Months.

19 Apr

Godstone (RH9)

New Solar PV Installation

Current Fuel Used: Gas. Number of Bedrooms: 4. Number of rooms: 6-10. Property Age: ····-····. Insulation: Loft & Cavity(...)

19 Apr

Horsham (RH12)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Discuss with engineer. Work Timescale: Within 3(...)

11 Apr

Crawley (RH10)

New Solar Thermal Installation

Direction of roof: Unsure. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: Yes. Work Timescale: Within 3 Months.

30 Mar

Horsham (RH13)

New Solar PV Installation

Current Fuel Used: Oil. Number of Bedrooms: 4. Number of rooms: 11-15. Property Age: ····-····. Insulation: Cavity wall(...)

29 Mar

Redhill (RH1)

New Solar PV Installation

Solar PV and battery, pitched and tiled. No windows, no shading, Timescale ASAP. Property House, owner

10 Mar

Pulborough (RH20)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Advice from installer - 5KW. Work Timescale:(...)

10 Mar

Haywards Heath (RH17)

New Solar PV Installation

Direction of roof: South. Roof style: Unsure. Material: Unsure. Shading: None. System size required: Open to suggestions. Work Timescale: Within 3 Months.(...)

07 Mar

Dorking (RH5)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 4-5kw. Work Timescale: ASAP.

02 Mar

Redhill (RH1)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 24kw. Work Timescale: Within 1 Year.

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue