• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Hebden Bridge

On average, our 1 Installers near Hebden Bridge are rated: (4.64/5)
Order:

Solec Energy Solutions Limited are a Leeds based company with over 25 years of experience in the electrical contracting arena.

location icon Old Tetley Hall, 40-42 Moor Road, Headingley, Leeds, LS6 4DB

phone icon0845 5193 543

On average, our 1 Installers near Hebden Bridge are rated: (4.64/5)
Order:

location iconNearby we also have installers in Todmorden Sowerby Bridge and Halifax

Latest Job requests posted in the United Kingdom

28 Jan

Teddington (TW11)

New Solar PV Installation with Battery

Work Timescale: Within 3 Months Direction of roof: West Roof style: Pitched/Angled Material: Tiled Shading: None

22 Jan

Yelverton, Norwich (NR14)

New Solar PV Installation

System required: Air to wet. Current Fuel Used: Oil. Number of rooms: 6-10. Work Timescale: Within 1 Year.

20 Jan

London (NW6)

New Solar PV Installation

Work Timescale: Within 1 Month Direction of roof: Unsure Roof style: Flat Material: Metal Shading: None

20 Jan

Nottingham (NG4)

Repair/Maintenance of Solar HW System

Current system size: Other. Work Timescale: ASAP. Additional notes: +++ 2 panels - 1 x 12 tubes & 1 x 8 tubes +++.

15 Jan

Alton (GU34)

Repair/Maintenance of Solar HW System

Current Fuel Used: Gas. Work Timescale: ASAP (I may have no heating or hot water).

10 Jan

London (W3)

New Solar PV Installation with Battery

Direction of roof: South. Roof style: Pitched/Angled. Material: Unsure. Shading: None. Work Timescale: Within 1 Year.

08 Jan

London (SE6)

New Solar PV Installation with Battery

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 1 Year. Additional notes: ++++ current boiler(...)

02 Jan

Wigan (WN2)

New Battery Installation (Solar PV)

Current system size: 8-10 Panels: 4kW. Current inverter: SolarEdge. Battery location: Open to Advice. Work Timescale: Within 3 Months.

27 Dec

Rugby (CV21)

New Solar PV Installation with Battery

System required: Air to wet. Current Fuel Used: Gas. Number of rooms: 11-15. Work Timescale: Within 1 Month.

18 Dec

Pontefract (WF8)

Repair/Maintenance of Solar PV System

Current system size: 10-13 Panels: 5kW. Work Timescale: ASAP.

09 Dec

Ammanford (SA18)

New Solar PV Installation with Battery

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 1 Month. Additional notes: Interested in a solar(...)

04 Dec

Swindon (SN25)

New Solar Thermal Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: . Work Timescale: Within 3 Months. Additional notes:(...)

04 Dec

Five roads ,Llanelli (SA15)

New Solar PV Installation with Battery

Direction of roof: West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 3 Months.

03 Dec

Northampton (NN6)

New Battery Installation (Solar PV)

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: ASAP.

20 Nov

Brighton (BN2)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. Work Timescale: Within 1 Year.

13 Nov

Craigavon (BT66)

New Solar PV Installation

System required: Air to wet. Current Fuel Used: Other. Number of rooms: 6-10. Work Timescale: Within 1 Year. Additional notes: **plans will be available**.

11 Nov

Bradford (BD7)

Repair/Maintenance of Solar PV System

Current Fuel Used: Gas. Brand of current system: Other. Age: Up to 5 yrs. Condition: Working but faulty. Work Timescale: ASAP (I may have no heating or hot(...)

11 Nov

Lytham St. Annes (FY8)

New Solar PV Installation - Remote Quote

Direction of roof: South. Roof style: Pitched/Angled. Material: Metal. Shading: None. Work Timescale: Within 6 Months.

06 Nov

Stevenage (SG2)

New Solar PV Installation with Battery

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 3 Months.

31 Oct

Rowlands Gill (NE39)

New Solar Thermal Installation

Work Timescale: Within 3 Months Direction of roof: South Roof style: Pitched/Angled Material: Tiled Shading: Yes - Nearby building

30 Oct

Malton (YO17)

New Solar PV Installation

Door material required: Wood. Doors required: 1.

30 Oct

Thames Ditton (KT7)

New Solar PV Installation with Battery

Work Timescale: Within 3 Months Direction of roof: South Roof style: Pitched/Angled Material: Tiled Shading: Yes - Nearby building

23 Oct

Ramsgate (CT11)

New Solar PV Installation with Battery

Direction of roof: North. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: ASAP. Additional notes: Reroofing to take place.

21 Oct

Aberdeen (AB12)

New Solar PV Installation with Battery

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 6 Months. Additional notes: march apeil 170sq m(...)

17 Oct

Southampton (SO14)

New Battery Installation (Solar PV)

Current Fuel Used: Electric. Brand of current system: Other. Age: Unsure. Condition: Unsure. Location: unsure. Work Timescale: ASAP (I may have no heating or(...)

17 Oct

Saxmundham (IP17)

New Solar PV Installation with Battery

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Metal. Shading: None. Work Timescale: Within 3 Months.

14 Oct

Bangor (LL57)

New Solar PV Installation with Battery

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. Work Timescale: ASAP.

14 Oct

Lincoln (LN4)

New Solar Thermal Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Windows on roof: Yes. Work Timescale: ASAP.

11 Oct

Uckfield (TN22)

New Solar PV Installation with Battery

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 3 Months.

10 Oct

Neston (CH64)

New Solar Thermal Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Other. Shading: None. Windows on roof: No. Work Timescale: Within 3 Months.

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue