• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in High Peak

On average, our 4 Installers near High Peak are rated: (4.74/5)
Order:

Plan Solar are MCS and RECC accredited and based in Sheffield.

location icon 33 Barnsley Road, Penistone, Sheffield, S36 8AE

phone icon08000016653

Solar Panel and Battery Storage Installation Company - Domestic and Commercial. We are a family-run, Yorkshire-based Renewable Energy Installations company(...)

location icon Unit 8, 33 Barnsley Road, Sheffield, S36 8AE

phone icon07715141109

Your trusted experts in solar panel installation. We focus on giving the best advice, and delivering the best value. Call now to discuss your free survey.

location icon 16-18 Station Street, Meltham, Holmfirth, HD9 5QL

phone icon01484218826

Custom Solar are a customer-focused company who guide you through every stage of your domestic / commercial solar PV installation process, whatever size your(...)

location icon Dunston Innovation Centre, Dunston Road, Chesterfield, S41 8NG

phone icon01246 488488

On average, our 4 Installers near High Peak are rated: (4.74/5)
Order:

location iconNearby we also have installers in Buxton Glossop and Hope Valley

Latest Job requests posted in Stockport

25 Jul

Stockport (SK3)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 1 Month.

28 May

Stockport (SK7)

New Solar Thermal Installation

Direction of roof: East. Material: Other. Roof style: Multiple. Shading: Yes - Nearby tree. Windows on roof: Yes. Work Timescale: ASAP.

11 May

Cheadle (SK8)

New Solar PV Installation with Battery

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: ASAP. Additional notes: Renovations.

23 Apr

High Peak (SK23)

New Solar PV Installation

Work Timescale: ASAP.

23 Feb

Macclesfield (SK10)

New Solar Thermal Installation

Direction of roof: South. Material: Unsure. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 1 Month.

26 Jan

Macclesfield (SK11)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to suggestions. Work Timescale: Within 3(...)

19 Jan

High Peak (SK23)

New Battery Installation (Solar PV)

Current system size: 16 panels. Current inverter: Unsure. Battery location: Loft. Work Timescale: Within 1 Month.

11 Jan

Buxton (SK17)

New Solar PV Installation

System required: Air to wet. Current Fuel Used: Gas. Age: Over 16 yrs. Number of Bedrooms: 2. Number of rooms: 6-10. Property Age:(...)

08 Oct

Macclesfield (SK10)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP.

04 Jul

Cheadle (SK8)

New Solar PV Installation

Direction of roof: North East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 4-6kwh. Work Timescale: Within 6 Months.

10 Jun

Macclesfield (SK10)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 6 Months.

07 Jun

Macclesfield (SK11)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 3 Months. Additional notes:(...)

06 Apr

Cheadle (SK8)

New Solar PV Installation

Current Fuel Used: Gas. Number of Bedrooms: 4. Number of rooms: 6-10. Property Age: ····-····. Insulation: Loft only.(...)

22 Mar

Stockport (SK7)

New Solar PV Installation

Current Fuel Used: Oil. Current system: Mistral. Age: Over 16 yrs. Condition: Working. Location: Garage, possibly keep there. Work Timescale: Within 3 Months.

10 Mar

Buxton (SK17)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Discuss with installer - maximum. Work Timescale:(...)

10 Mar

Stockport (SK5)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 1 Month.

25 Feb

Macclesfield (SK11)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Other. Shading: Yes - Nearby tree. System size required: be advised. Work Timescale: ASAP.

16 Feb

Macclesfield (SK11)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP.

30 Jan

Wilmslow (SK9)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Unsure. Shading: None. System size required: Discuss with engineer. Work Timescale: Within 6(...)

20 Jan

Wilmslow (SK9)

New Solar Thermal Installation

Direction of roof: East. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: Yes. Work Timescale: Within 3 Months. Additional notes:(...)

30 Nov

Hyde (SK14)

New Battery Installation (Solar PV)

Current system size: 4kw maybe. Current inverter: Solar Edge. Battery location: Garage. Work Timescale: ASAP. Additional notes: Customer would only like to hear(...)

09 Sep

Cheadle (SK8)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby building. System size required: Open to advice. Work Timescale:(...)

30 Jul

Hyde (SK14)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Discuss with installer. Work Timescale: ASAP.

14 Jun

Macclesfield (SK10)

New Solar Thermal Installation

Roof: South West. Pitched and Tiled. There is no shading that will effect the panels No windows in the roof. Looking for 4kwh size system. Install ASAP. Contact(...)

14 Jun

Macclesfield (SK10)

New Solar PV Installation

Roof: South West. Pitched and Tiled. There is no shading that will effect the panels No windows in the roof. Looking for 4kwh size system. Install ASAP. Contact(...)

10 Jun

Glossop (SK13)

New Solar Thermal Installation

Roof direction: South-East Facing. Pitched and slated. No shading and no windows in the roof. Up to 3-4 KW system. Customer is unsure about whether they have an(...)

21 Sep

High Peak (SK23)

New Solar PV Installation

Roof: South facing. Pitched and slated. Might have shading from next door. Has 3 veluxes on the roof. Install within 3 month. Contact anytime.

19 Jan

Glossop (SK13)

New Solar PV Installation

Roof: South facing. Pitched and slate. No shading. No windows on the roof. Install within 1 month. Contact anytime.

02 Nov

High Peak (SK23)

New Solar Thermal Installation

Direction of roof: South facing. Pitched, tiled roof. No chimneys. No windows. Small amount of shading from next door. Call anytime. Install within 6 months.

25 Jun

High Peak (SK23)

Repair/Maintenance of Solar HW System

We have a solar system which we recently upgraded 3 years ago to include an unvented tank (Gledhill) and vaillent boiler (37kw). I suspect the engineers who(...)

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue