• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Prestonpans

On average, our 10 Installers near Prestonpans are rated: (3.00/5)
Order:

All Renewable Energy Ltd is MCS accredited installer. This allows customers to access available government grants. We design, supply, install and commission:(...)

location icon Office 8 Friarton House, Friarton Road, Perth, PH2 8BB

phone icon0800 002 9175

An Award winning Building services company established for more than 15 years, G&H Groups reputation within the building services industry is unrivalled.(...)

location icon Unit 1-2A, Spence Mills, Leeds, LS13 3HE

phone icon01132556433

Genfit specialise in solar PV, solar thermal, biomass and wind turbines.

location icon Evans Business Centre Chester West Employment Park, Minerva Avenue, Chester, CH1 4QL

phone icon03445679032

Family run company, Operating for over 25 years,Offering turnkey solutions for small to large projects. We specialise in Photo voltaic systems (PV) Solar(...)

location icon Unit 18 Whaddon Business Park, Whaddon, Salisbury, SP5 3HF

phone icon01794 516004

Low Energy Services Ltd are a renewable energy company based in Glasgow.

location icon 4 Acton Gardens, Glasgow, G75 8WH

phone icon01355204486

Boilers, Air con, PV Solar, Batteries and EV Charging Experts.

location icon Floor 5, Avalon, 26-32 Oxford Road, Bournemouth, BH8 8EZ

phone icon03301139488

ECEC Group Ltd is an Edinburgh based Electrical Contractors with a wide and varied customer base across Edinburgh and the Lothians.
We are a professional and(...)

location icon Unit 30, Imex Centre, Loanhead, EH20 9LZ

phone icon01312811501

Alba Heat and Power are very customer orientated and we have reams of testimonials to show that. We believe if you receive a good service from us then you will(...)

location icon 60 Octavia Street, Kirkcaldy, KY2 5HH

phone icon01592596789

Boxergy are a Scottish company focused on making low carbon heat affordable for all.

Our plan is to bring together existing technologies and a smart tariff(...)

location icon Unit 10 Covault, 9 Harvest Rd, Newbridge, EH28 8PJ

phone icon07824703399

We are a small family firm of electrical engineers that have been trading for 30 years.

We have a simple philosophy...We will treat your house as if it were(...)

location icon 5 Maryfield Gardens, Leslie, Glenrothes, KY6 3JT

phone icon01592741423

On average, our 10 Installers near Prestonpans are rated: (3.00/5)
Order:

location iconNearby we also have installers in Tranent Musselburgh and Longniddry

Latest Job requests posted in Edinburgh

08 Apr

Edinburgh (EH17)

New Battery Installation (Solar PV)

Current system size: 9 panels. Current inverter: Solor Edge. Battery location: Open to advice. Work Timescale: ASAP.

04 Apr

Edinburgh (EH11)

New Solar PV Installation with Battery

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 3 Months. Additional notes: +++ possible roof(...)

22 Aug

Edinburgh (EH16)

New Solar PV Installation

Current Boiler: Glow worm. 6/7 years old. Not working. Located in the living room, would like to keep in the same place. Replace asap. Contact evenings.

28 Jul

Penicuik (EH26)

New Solar PV Installation - Online Quote

Not Applicable

04 May

Tranent (EH34)

Repair/Maintenance of Solar HW System

Current system size: 1 panel. Work Timescale: ASAP.

25 Apr

Edinburgh (EH12)

New Battery Installation (Solar PV)

Current system size: none. Current inverter: unsure. Battery location: Garage. Work Timescale: Within 3 Months.

20 Apr

Edinburgh (EH14)

New Solar PV Installation

Direction of roof: West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to suggestions. Work Timescale: ASAP.

04 Nov

South Queensferry (EH30)

New Solar Thermal Installation

Direction of roof: Unsure. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: Yes. Work Timescale: Within 3 Months. Additional notes:(...)

24 Oct

Kirkliston (EH29)

New Solar Thermal Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Unsure. Shading: None. Windows on roof: Yes. Work Timescale: Within 6 Months.

05 Oct

Edinburgh (EH10)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 3 Months.

26 Sep

Edinburgh (EH6)

New Solar Thermal Installation

Direction of roof: Unsure. Roof style: Flat. Material: Other. Shading: None. Windows on roof: Yes. Work Timescale: ASAP. Additional notes: l need to arrange(...)

26 Sep

Edinburgh (EH6)

New Solar PV Installation

Work Timescale: ASAP.

16 Sep

Penicuik (EH26)

New Battery Installation (Solar PV)

Current system size: 3.5kw. Current inverter: Solar Edge. Battery location: Open to advice. Work Timescale: Within 3 Months.

12 Aug

Musselburgh (EH21)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Metal. Shading: None. System size required: advice needed. Work Timescale: ASAP.

01 Aug

Edinburgh (EH15)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Other. Shading: None. System size required: Open to advice. Work Timescale: Within 3 Months.

27 Jul

Bathgate (EH48)

New Battery Installation (Solar PV)

System required: Air to wet. Current Fuel Used: Gas. Age: 11 - 15 yrs. Number of Bedrooms: 5. Number of rooms: 11-15. Property Age: After 1980. Insulation: Loft(...)

13 Apr

Prestonpans (EH32)

New Solar PV Installation

System required: Air to wet. Current Fuel Used: Gas. Age: 6 - 10 yrs. Number of Bedrooms: 3. Number of rooms: 6-10. Property Age: Before 1900. Insulation: Loft(...)

10 Apr

West Linton (EH46)

New Solar PV Installation

System required: Air to wet. Current Fuel Used: LPG. Age: 6 - 10 yrs. Number of Bedrooms: 5. Number of rooms: 6-10. Property Age: After 1980. Insulation: Loft &(...)

27 Oct

Musselburgh (EH21)

New Battery Installation (Solar PV)

Current system size: 1.97kw. Current inverter: Unsure. Battery location: Loft. Work Timescale: ASAP.

16 Jul

Rosewell (EH24)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: unsure. Work Timescale: Within 3 Months.(...)

01 Jul

Gorebridge (EH23)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: ASAP.

26 Apr

Edinburgh (EH9)

Repair/Maintenance of Solar HW System

Solar panel system requires service - please can you contact me if this is possible to discuss Thanks

09 Apr

Livingston (EH53)

New Solar PV Installation

Direction of roof: South. Pitched & Tiled. No shading. No windows. Unsure of size. Interested in a battery. Install ASAP. Contact anytime.

14 Sep

Longniddry (EH32)

New Solar PV Installation

Roof: South. Pitched and Tiled. There is no shading that will effect the panels. There are no windows in the roof. Looking for advice on the size system needed.(...)

25 Aug

Livingston (EH54)

Repair/Maintenance of Solar PV System

***Replacement Inverter*** 4kW solar PV system installed 8 years ago. The inverter has now failed and I am looking to get a replacement installed. The original(...)

12 Nov

Livingston (EH54)

New Solar PV Installation

Roof facing: Unsure. Pitched and tiled. No shading No windows. Contact anytime. *Customer notes - Currently has solar but only work doing the day i am wanting(...)

07 Aug

Bathgate (EH48)

New Solar Thermal Installation

Roof direction: South. Pitched and slate. Shading in the winter from neighbouring trees. No windows. Install: within 3 months. Contact: evenings

01 Oct

Bathgate (EH48)

New Solar PV Installation

Roof: South facing. Pitched and slate. No shading. No windows. Open to advice on the size of the system needed. Install within 3 months. Contact anytime.

04 May

Linlithgow (EH49)

New Battery Installation (Solar PV)

Battery retrofit to 3.2kW PV system with ABB PVI inverter.

25 Apr

Balerno (EH14)

New Solar PV Installation

Roof: South facing. Pitched and slate. No shading. No windows. Open to advice on the size of the system needed. Install within 1 month. Contact between 5pm -(...)

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue