• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Basingstoke

On average, our 6 Installers near Basingstoke are rated: (4.45/5)
Order:

Basingstoke Energy Services Co-operative is owned by our workers; for the benefit our community. We provide high value renewable energy installations (solar PV(...)

location icon Belvedere House, Basing View, Basingstoke, RG21 4HG

phone icon01256 805372

SUNUTI is a technology-driven renewable energy UK marketplace focusing on Solar PV solutions. Batteries, Heat Pumps & EV Chargers. ⌱ Powered by Tech ⦿

location icon Cheyenne House, West Street, Farnham, GU9 7EQ

phone icon0333 772 3285

We are a family run business with customer satisfaction as our main goal.

location icon 20 Portman Road, Reading, RG30 1EA

phone icon0118967033

We are a commercial and industrial electrical contractor. Specialising in renewable energy and low energy electrical systems. We are always looking to offer our(...)

location icon 36B London Road, Bagshot, GU19 5HN

phone icon0800 5677 629

High quality, cost effective, solar PV installations underatken by 2 mature ex-aerospace engineers, providing an exceptional customer experience with full(...)

location icon 7 Critchmere Hill, Haslemere, GU27 1LS

phone icon01428 643484

Complete home improvements specialists. Fully approved, insured and accredited members of HICS and Trust a Trader giving our customers complete peace of mind.

location icon Antrobus House, 18 College Street, Petersfield, GU31 4AD

phone icon08000236181

On average, our 6 Installers near Basingstoke are rated: (4.45/5)
Order:

location iconNearby we also have installers in Hook Tadley and Alton

Latest Job requests posted in Reading

14 May

Bracknell (RG42)

New Solar PV Installation with Battery

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 6 Months.

08 Apr

Basingstoke (RG21)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 1 Month.

13 Mar

Henley-on-Thames (RG9)

New Solar PV Installation with Battery

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: . Work Timescale: Within 6 Months.(...)

21 Feb

Newbury (RG20)

New Solar PV Installation

Work Timescale: Within 1 Year.

16 Oct

Hungerford (RG17)

Repair/Maintenance of Solar PV System

Current system size: 6.5kw. Work Timescale: ASAP.

30 Mar

Basingstoke (RG21)

New Solar PV Installation

Work Timescale: Within 6 Months.

09 Dec

Reading (RG8)

New Solar PV Installation

Current Fuel Used: Oil. Number of Bedrooms: 5+. Number of rooms: 11-15. Property Age: ····-····. Insulation: Loft &(...)

24 Nov

Reading (RG30)

New Solar PV Installation

Direction of roof: West. Roof style: Flat. Material: Other. Shading: None. System size required: Take Advice. Work Timescale: Within 6 Months.

21 Nov

Reading (RG6)

New Solar PV Installation

I am interested in replacing gas boiler that heats warm air CH and other electric supply by an electric combi boiler powered by solar energy. I am not(...)

03 Nov

Thatcham (RG19)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: unsure. Work Timescale: Within 3 Months.

28 Sep

Henley-on-Thames (RG9)

New Battery Installation (Solar PV)

Current system size: 20 panels. Current inverter: Unsure. Battery location: Garage. Work Timescale: Within 3 Months.

28 Sep

Bracknell (RG12)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP.

22 Sep

Bracknell (RG12)

New Solar PV Installation

Would like to install solar panels at the same time if possible

03 Sep

Reading (RG5)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 1 Month.

31 Aug

Basingstoke (RG25)

New Solar PV Installation

System required: Air to wet. Current Fuel Used: Oil. Age: 6 - 10 yrs. Number of Bedrooms: 4. Number of rooms: 6-10. Insulation: Loft & Cavity wall. Windows:(...)

24 Aug

Wokingham (RG40)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: discuss installer-. Work Timescale:(...)

08 Aug

Bracknell (RG42)

New Solar PV Installation

Direction of roof: South. Roof style: Flat. Material: Metal. Shading: None. System size required: Discuss with installer. Work Timescale: Within 3 Months.(...)

28 Jun

Hook (RG29)

New Battery Installation (Solar PV)

Current system size: 16 panels. Current inverter: unsure. Battery location: in the garage. Work Timescale: ASAP. Additional notes: Has hybrid car wants a(...)

05 May

Wokingham (RG40)

New Solar PV Installation

System required: Air to wet. Current Fuel Used: Gas. Age: Over 16 yrs. Number of Bedrooms: 4. Number of rooms: 6-10. Property Age:(...)

30 Apr

Hook (RG27)

New Solar PV Installation

Direction of roof: South. Roof style: Unsure. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: ASAP. Additional notes:(...)

26 Apr

Hook (RG27)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestion. Work Timescale: Within 6 Months.

13 Mar

Newbury (RG20)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: Open to advice. Work Timescale: Within(...)

11 Mar

Bracknell (RG42)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: 4kw. Work Timescale: Within 6(...)

08 Mar

Bracknell (RG42)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: ASAP.

07 Mar

Wokingham (RG41)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: Open to suggestions. Work(...)

28 Feb

Tadley (RG26)

New Solar PV Installation

Solar PV required. Roof: pitched, tiled, facing south. No shade cast upon the roof. Would like to discuss size of system required. Timescale: within 6 months.(...)

27 Feb

Basingstoke (RG25)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: Yes - Nearby tree. System size required: Advice from installer. Work Timescale: Within(...)

31 Jan

Henley-on-Thames (RG9)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: Yes. Work Timescale: Within 6 Months.

25 Nov

Newbury (RG14)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: Approx 5.333 kw. Work Timescale:(...)

16 Nov

Wokingham (RG41)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP.

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue