• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Southwold

On average, our 9 Installers near Southwold are rated: (4.55/5)
Order:

Specialist in all renewable aspects including Solar PV, Battery Storage and Air Source Heat Pumps. We are RHI installer of the year for the South East region(...)

location icon Queen Court, 9-17 Eastern Road, Romford, RM1 3NH

phone icon07736740237

We are a specialist energy company providing solar power, electric vehicle charging points and all other electrical solutions to residential and commercial(...)

location icon Suite 12, Connaught Mews, Frinton-On-Sea, CO13 9AD

phone icon08000016724

Princeenergy (formerly Princesolar) is a trading division of Princebuild Limited, one of the Eastern Regions most trusted family Building Maintenance and(...)

location icon Empson Road, Peterborough, PE1 5UP

phone icon08456007800

EFS Ltd is a Solar PV and Electrical contracting company established since 1971. We install, design and maintain Solar PV systems from 1KW domestic to 1(...)

location icon 2 Hillybroom Gardens, West Mersea, Colchester, CO5 8UG

phone icon01206386965

M Y Group is a Southern based heating and electrical contractor, offering a full in house one stop shop for renewables, and associated works, using our own(...)

location icon Fen Lane Farm, Watton Road, Norwich, NR16 2AJ

phone icon01953 497177

We design, supply and install high quality renewable energy systems using components from leading manufacturers. Phuse is fully certified and government(...)

location icon G T E C House Unit 5, Charcoals Way, Hawes, DL8 3AU

phone icon03330143263

At Wallop Energy we pride ourselves on giving the very best customer service.

Whatever your question, we are here for you 24/7 365 days a year.

location icon 7Th Floor, One Canada Square, London, E14 5AA

phone icon08006528800

Boilers, Air con, PV Solar, Batteries and EV Charging Experts.

location icon Floor 5, Avalon, 26-32 Oxford Road, Bournemouth, BH8 8EZ

phone icon03301139488

Greenfuture Energy offer a design, supply and installation service to meet all of you renewable energy needs.

Contact Greenfuture energy for a no obligation(...)

location icon Unit 3, Farnham Industrial Estate, Saxmundham, IP17 1JZ

phone icon01728 604368

On average, our 9 Installers near Southwold are rated: (4.55/5)
Order:

location iconNearby we also have installers in Halesworth Leiston and Beccles

Latest Job requests posted in Ipswich

17 Oct

Saxmundham (IP17)

New Solar PV Installation with Battery

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Metal. Shading: None. Work Timescale: Within 3 Months.

03 Sep

Bury St. Edmunds (IP30)

New Battery Installation (Solar PV)

Work Timescale: Within 1 Month.

24 May

Middleton, Suffolk (IP17)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. Work Timescale: Within 3 Months.

17 Feb

Ipswich (IP2)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 3 Months.

24 Jan

Ipswich (IP3)

Repair/Maintenance of Solar HW System

Current system size: unsure. Work Timescale: ASAP.

09 Jan

Ipswich (IP3)

Repair/Maintenance of Solar HW System

Current system size: unsure. Work Timescale: ASAP.

08 Nov

Ipswich (IP4)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: discuss with installer. Work Timescale: Within 6(...)

28 Oct

Ipswich (IP2)

New Battery Installation (Solar PV)

Current system size: 3 KW. Current inverter: unsure. Battery location: open to advice. Work Timescale: ASAP.

17 Oct

Stowmarket (IP14)

New Solar PV Installation

Work Timescale: Within 6 Months.

14 Sep

Ipswich (IP3)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to suggestions. Work Timescale: Within 1(...)

30 Aug

Thetford (IP24)

New Solar PV Installation

Direction of roof *South Roof style *Pitched/Angled Roof material *Tiled Shading *Yes - Nearby building Any windows on roof? *Yes System size required? Open to(...)

03 Aug

Diss (IP22)

New Battery Installation (Solar PV)

System required: Air to wet. Current Fuel Used: Oil. Age: Over 16 yrs. Number of Bedrooms: 3. Number of rooms: 6-10. Property Age: After 1980. Insulation: Loft(...)

14 Jul

Ipswich (IP4)

Repair/Maintenance of Solar PV System

Current system size: 4kw. Work Timescale: ASAP. Additional notes: Looking to add to an existing 4kw system and add a Tesla battery.

28 May

Woodbridge (IP13)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 6 Months.(...)

20 May

Diss (IP22)

New Battery Installation (Solar PV)

Current system size: 4kw. Current inverter: unsure. Battery location: under stairs. Work Timescale: ASAP.

14 Apr

Ipswich (IP9)

New Solar PV Installation

Current Fuel Used: Oil. Number of Bedrooms: 4. Number of rooms: 6-10. Property Age: ····-····. Insulation: Loft & Cavity(...)

16 Mar

Bury St. Edmunds (IP30)

New Solar PV Installation

Direction of roof: West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 3.8 KW. Work Timescale: ASAP.

08 Mar

Bury St. Edmunds (IP30)

New Solar PV Installation

Direction of roof: West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 3.8 KW. Work Timescale: ASAP.

27 Jan

Eye (IP23)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 4 kw. Work Timescale: Within 6 Months. Additional(...)

13 Nov

Woodbridge (IP13)

Repair/Maintenance of Solar PV System

Current system size: 16 panels. Work Timescale: Within 3 Months. Additional notes: System has been idle for a while, customer is looking to get a quote to have(...)

14 Oct

Diss (IP21)

New Solar PV Installation

Direction of roof: West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Advice from installer. Work Timescale: Within 3(...)

13 Sep

Brandon (IP27)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: Approx 2.5KW. Work Timescale:(...)

15 Jul

Ipswich (IP1)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: unsure. Work Timescale: ASAP.

04 Jul

Woodbridge (IP13)

Repair/Maintenance of Solar PV System

Current system size: 14 panels - 4 KW. Work Timescale: Within 1 Month. Additional notes: Inverter cuts out as soon as generation goes above 3KW, this last 10-15(...)

28 Jun

Felixstowe (IP11)

Repair/Maintenance of Solar PV System

Current system size: 16 panels. Work Timescale: ASAP. Additional notes: Arora inverter keeps going off. Located in the loft. Error message: RIso low.

03 Mar

Stowmarket (IP14)

New Solar PV Installation

Roof facing: South East. Pitched and tiled. No shading. No windows. Open to advice on system size. Interested in discussing a battery installation. Is there(...)

17 Feb

Ipswich (IP2)

New Solar PV Installation

Roof: South Facing and East Facing. Pitched and Tiled. No Shading. No Windows. Looking for 16 Panels. Install within 3 months. Contact anytime.

14 Dec

Ipswich (IP7)

Repair/Maintenance of Solar HW System

Veridian HW system. Located in the airing cupboard. Service only. Customer just moved in and does not know whether or not it works so would like a service.(...)

30 Nov

Stowmarket (IP14)

New Solar PV Installation

Roof facing: South. Pitched and tiled. No shading and no windows. Open to advice on system size. Install ASAP. Contact anytime.

17 Nov

Saxmundham (IP17)

New Solar PV Installation

Roof facing: South. Pitched and tiled. No shading. No windows. Open to advice on system size but maybe 6/7kw. Not interested in discussing a battery(...)

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue