• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Bexhill-On-Sea

On average, our 2 Installers near Bexhill-On-Sea are rated: (4.42/5)
Order:

Ohm Energy are renewable energy installers based in the south east of the Uk. We install technologies such as Photovoltaics (PV), Biomass, Heat pumps and Solar(...)

location icon Unit 24, Hawthorn Road, Eastbourne, BN23 6QA

phone icon01435 817014

CDS Electrical contractors are a company specialising in the renewables market, together with domestic and commercial electrical installations . We have been(...)

location icon Unit F1 Chaucer Business Park, Dittons Road, Polegate, BN26 6JF

phone icon01323734162

On average, our 2 Installers near Bexhill-On-Sea are rated: (4.42/5)
Order:

location iconNearby we also have installers in St. Leonards-On-Sea Hastings and Battle

Latest Job requests posted in Tonbridge

11 Oct

Uckfield (TN22)

New Solar PV Installation with Battery

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 3 Months.

22 Jul

Uckfield (TN22)

New Solar PV Installation - Remote Quote

Work Timescale: Within 1 Month. Property Ownership: Property Owner.

02 May

Cranbrook (TN17)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: . Work Timescale: Within 3 Months. Additional(...)

01 Mar

Cranbrook (TN18)

New Battery Installation (Solar PV)

Current system size: 3.9kw. Current inverter: Solex. Battery location: coalhouse wall. Work Timescale: Within 1 Month.

20 Jan

Etchingham (TN19)

Repair/Maintenance of Solar PV System

Current system size: 31. Work Timescale: ASAP.

25 Nov

Sevenoaks (TN15)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advise. Work Timescale: ASAP.

17 Nov

Tonbridge (TN12)

New Battery Installation (Solar PV)

Current system size: 4KW. Current inverter: Solar Edge. Battery location: Garage. Work Timescale: Within 3 Months.

20 Oct

Uckfield (TN22)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Other. Shading: None. System size required: Open to advice. Work Timescale: Within 3 Months.

12 Oct

Tunbridge Wells (TN3)

New Solar PV Installation

Looking to replace a Gas boiler with an electric one

06 Sep

Uckfield (TN22)

New Solar PV Installation

Work Timescale: ASAP.

23 Aug

Ashford (TN25)

New Solar PV Installation

System required: Air to wet. Current Fuel Used: Gas. Age: Up to 5 yrs. Number of Bedrooms: 5. Number of rooms: 6-10. Property Age: After 1980. Insulation: Loft(...)

23 Aug

Tonbridge (TN11)

New Solar PV Installation

Direction of roof: West. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby building. System size required: open to advice. Work Timescale:(...)

17 Aug

Rye (TN31)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 3 Months.(...)

15 Aug

Tunbridge Wells (TN2)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Other. Shading: None. System size required: Open to advice. Work Timescale: ASAP.

10 Aug

Tonbridge (TN12)

New Solar Thermal Installation

Direction of roof: East. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 6 Months.

29 Jun

Uckfield (TN22)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP.

17 Jun

Bexhill-on-Sea (TN39)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: ASAP.

23 May

Crowborough (TN6)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: advice required. Work Timescale: ASAP.

17 May

Cranbrook (TN18)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Other. Work Timescale: Within 3 Months.

09 May

Wadhurst (TN5)

Repair/Maintenance of Solar HW System

Current system size: 4kWh (17 panels). Work Timescale: Within 1 Month.

29 Apr

Hastings (TN34)

New Solar PV Installation

Direction of roof: South. Roof style: Flat. Material: Other. Shading: None. System size required: Open to advice. Work Timescale: Within 3 Months.

20 Apr

Tenterden (TN30)

New Battery Installation (Solar PV)

Current system size: 4kw. Current inverter: sunny boy. Battery location: outhouse. Work Timescale: Within 1 Month.

08 Mar

Bexhill-on-Sea (TN39)

New Battery Installation (Solar PV)

Current system size: Unsure. Current inverter: Unsure. Battery location: Garage. Work Timescale: Within 3 Months.

07 Mar

Ashford (TN24)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 3(...)

28 Feb

Cranbrook (TN17)

New Solar PV Installation

Replacing an old heating system. Interested in electric boiler system + solar panels

20 Feb

Crowborough (TN6)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Other. System size required: 16 panels - 6kw. Work Timescale: ASAP.

04 Feb

Ashford (TN24)

New Solar PV Installation

Direction of roof: South. Roof style: Other. Material: Tiled. Shading: None. System size required: 3.7-4 kw. Work Timescale: Within 3 Months.

30 Jan

Sevenoaks (TN14)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Other. Shading: None. System size required: open to advice. Work Timescale: Within 3 Months. Additional(...)

26 Jan

Ashford (TN27)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: Yes - Nearby tree. System size required: be advised. Work Timescale: Within 3 Months.(...)

26 Jan

Sevenoaks (TN14)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 6 Months.

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue