• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Forest Row

On average, our 9 Installers near Forest Row are rated: (4.43/5)
Order:

Chelsfield Solar has been installing high-quality solar photovoltaic (PV) systems throughout the South East since 2002. Our highly experienced team provide a(...)

location icon Van Hage Garden Centre, Pepper Hill, Great Amwell, SG12 9RP

phone icon01442 211766

Eco Greenenergy Solutions specialise in domestic and commercial installs, Solar PV, Solar Battery storage, Air source heat pumps, air to air and any other(...)

location icon Unit 30 Woodside Industrial Estate, Woodside, Thornwood, Epping, CM16 6LJ

phone icon08001114805

Boilers, Air con, PV Solar, Batteries and EV Charging Experts.

location icon Floor 5, Avalon, 26-32 Oxford Road, Bournemouth, BH8 8EZ

phone icon03301139488

SAS Home Heat has been formed to service SAS Energy’s existing and new domestic customers for all their plumbing, heating and renewable energy needs.

location icon Unit 9, Edenbridge Trade Centre, Edenbridge, TN8 5EA

phone icon01732 247006

TRUSTED LOCAL INSTALLER Fairway Traders Ltd ARE ACCREDITED BY GAS SAFE AND SPECIALISE IN SOLAR PV, THEY ARE BASED IN WEST SUSSEX.

location icon 12 St. Catherines Road, Crawley, RH10 3TA

phone icon07429699577

L&C Installations was established in 1997 and provides a range of electrical services from domestic wiring, installation and testing to commercial power and(...)

location icon 92 Kingsley Road, Horley, RH6 8AW

phone icon01293 415740

We provide gas, heating & plumbing, electrical, solar PV, renewable energy services in the Sussex area and beyond.

location icon Unit 3 Sovereign Business Park, Albert Drive, Burgess Hill, RH15 9TY

phone icon01444480444

Solid Electrical has over a decade of experience of installation and maintenance of solar PV systems.

location icon 123 Capital Business Centre, Calrton Road, South Croydon, CR2 0BS

phone icon08000614600

Switch to renewable energy and reduce your carbon footprint with Solar Panels from Sunbright Energy. Get competitive quotes from trusted suppliers in Kent,(...)

location icon Unit 5, Tower Industrial Estate, London Road, Wrotham, TN15 7NS

phone icon01622278029

On average, our 9 Installers near Forest Row are rated: (4.43/5)
Order:

location iconNearby we also have installers in East Grinstead Hartfield and Lingfield

Latest Job requests posted in Redhill

10 Jun

Redhill (RH1)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Other. Shading: None. Work Timescale: Within 3 Months.

10 Apr

Billingshurst (RH14)

New Solar PV Installation - Remote Quote

Work Timescale: Within 1 Month. Additional notes: move in on the 19th of April.

10 Feb

Horsham (RH12)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 6 Months.

06 Dec

OXTED (RH8)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. Work Timescale: Within 6 Months.

24 Oct

Billingshurst (RH14)

New Solar PV Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Work Timescale: Within 3 Months.

25 Aug

Burgess Hill (RH15)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: None. System size required: 12 kwatts. Work Timescale: Within 6 Months. Additional(...)

19 Jul

East Grinstead (RH19)

Solar PV Battery (Repair/Maintenance)

Current system size: 12 panels. Current system: Samsung. Work Timescale: ASAP.

12 May

Oxted (RH8)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Take Advice. Work Timescale: Within 3 Months.(...)

15 Dec

Reigate (RH2)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 3(...)

16 Nov

Horsham (RH13)

New Solar PV Installation

Direction of roof: South. Roof style: Other. Material: Other. Shading: None. System size required: advice needed. Work Timescale: ASAP. Additional notes: alt.(...)

10 Oct

Pulborough (RH20)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: ASAP. Additional(...)

05 Oct

Pulborough (RH20)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: ASAP. Additional(...)

24 Aug

Burgess Hill (RH15)

New Solar PV Installation

Current Fuel Used: Gas. Number of Bedrooms: 5+. Required location: advice needed. Number of rooms: 11-15. Property Age: After 1980. Insulation: Loft & Cavity(...)

19 Aug

Lingfield (RH7)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 1 Year.(...)

16 Aug

Horley (RH6)

New Battery Installation (Solar PV)

Current system size: 1.28kw. Current inverter: unsure. Battery location: open to advice. Work Timescale: Within 3 Months.

16 Aug

Horley (RH6)

New Solar Thermal Installation

Direction of roof: South West. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: Within 3 Months.

04 Aug

Crawley (RH10)

New Solar PV Installation

Current Fuel Used: Oil.

03 Aug

Crawley (RH10)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: open to advice. Work Timescale: ASAP.

25 May

Redhill (RH1)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 6 Months.

18 May

Horsham (RH13)

New Battery Installation (Solar PV)

Current system size: 4kW X 2 systems. Current inverter: unknown. Battery location: Open to suggestions. Work Timescale: ASAP.

28 Apr

Horsham (RH12)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: None. System size required: Open to suggestions. Work Timescale: Within 6 Months.

19 Apr

Godstone (RH9)

New Solar PV Installation

Current Fuel Used: Gas. Number of Bedrooms: 4. Number of rooms: 6-10. Property Age: ····-····. Insulation: Loft & Cavity(...)

19 Apr

Horsham (RH12)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Discuss with engineer. Work Timescale: Within 3(...)

11 Apr

Crawley (RH10)

New Solar Thermal Installation

Direction of roof: Unsure. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: Yes. Work Timescale: Within 3 Months.

30 Mar

Horsham (RH13)

New Solar PV Installation

Current Fuel Used: Oil. Number of Bedrooms: 4. Number of rooms: 11-15. Property Age: ····-····. Insulation: Cavity wall(...)

29 Mar

Redhill (RH1)

New Solar PV Installation

Solar PV and battery, pitched and tiled. No windows, no shading, Timescale ASAP. Property House, owner

10 Mar

Pulborough (RH20)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Advice from installer - 5KW. Work Timescale:(...)

10 Mar

Haywards Heath (RH17)

New Solar PV Installation

Direction of roof: South. Roof style: Unsure. Material: Unsure. Shading: None. System size required: Open to suggestions. Work Timescale: Within 3 Months.(...)

07 Mar

Dorking (RH5)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 4-5kw. Work Timescale: ASAP.

02 Mar

Redhill (RH1)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 24kw. Work Timescale: Within 1 Year.

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue