• pen icon Complete our simple form
  • quote icon Up to 4 solar companies will contact you
  • thumbs up icon You choose the best quote

Find Solar PV and Solar Thermal installers in Eastleigh

On average, our 5 Installers near Eastleigh are rated: (4.57/5)
Order:

Premier Connections are MCS accredited and based in Waterlooville.

location icon 15B Somerset House, Hussar Court, Waterlooville, PO7 7SG

phone icon02392252502

Solar PV, Battery Storage and Electric Vehicle charger point specialist.

location icon 129 Green Lane, Clanfield, Waterlooville, PO8 0LG

phone icon02392368864

Our aim is to design and install Renewable Energy Systems along with providing our engineering skills and expertise in the most cost effective and efficient way(...)

location icon 13 Old Rectory Road, Portsmouth, PO6 1AH

phone icon02392 341835

Complete home improvements specialists. Fully approved, insured and accredited members of HICS and Trust a Trader giving our customers complete peace of mind.

location icon Antrobus House, 18 College Street, Petersfield, GU31 4AD

phone icon08000236181

Solar Renewable Installations Ltd is a fully integrated provider of energy saving solutions across the Mechanical, Electrical & Renewable industries. Having(...)

location icon 2-4 Dodnor Park, Newport, PO30 5XE

phone icon01983 730619

On average, our 5 Installers near Eastleigh are rated: (4.57/5)
Order:

location iconNearby we also have installers in Romsey Winchester and Southampton

Latest Job requests posted in Southampton

17 Oct

Southampton (SO14)

New Battery Installation (Solar PV)

Current Fuel Used: Electric. Brand of current system: Other. Age: Unsure. Condition: Unsure. Location: unsure. Work Timescale: ASAP (I may have no heating or(...)

02 Aug

Southampton (SO19)

Repair/Maintenance of Solar PV System

Current system size: 6 panels. Work Timescale: ASAP.

17 May

Southampton (SO16)

New Battery Installation (Solar PV)

Current system size: 7 panels. Current inverter: Fosis. Battery location: open to advice. Work Timescale: Within 6 Months.

30 Jan

Southampton (SO16)

New Solar PV Installation

Direction of roof: South West. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: 3kW. Work Timescale: ASAP.

28 Jan

Winchester (SO22)

New Solar PV Installation

Direction of roof: South East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: open to advice. Work Timescale: Within 3(...)

04 Dec

Winchester (SO22)

New Solar PV Installation

Direction of roof *South Roof style *Pitched/Angled Roof material *Other Shading *None Any windows on roof? *No System size required? Open to advice Are you(...)

28 Nov

Eastleigh (SO53)

New Battery Installation (Solar PV)

Current system size: 4.7kw. Current inverter: Solex. Battery location: garage. Work Timescale: ASAP. Additional notes: already has battery - wants another one.

03 Nov

Southampton (SO40)

New Solar Thermal Installation

Direction of roof: South. Material: Metal. Roof style: Flat. Shading: None. Windows on roof: No. Work Timescale: Within 6 Months.

02 Nov

Winchester (SO23)

New Solar PV Installation

Direction of roof: East. Roof style: Pitched/Angled. Material: Tiled. Shading: None. System size required: Open to advice. Work Timescale: Within 6 Months.

28 Sep

Alresford (SO24)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: ASAP.

11 Sep

Southampton (SO18)

New Solar PV Installation

Supply and fit of solar PV required. Roof: pitched/tiled/no shade/no windows. Would like to discuss a battery as part of the system. Timescale: within 3 months.

03 Aug

Winchester (SO23)

New Battery Installation (Solar PV)

Current system size: 4kW. Current inverter: Scatter. Battery location: Attic. Work Timescale: Within 1 Month. Additional notes: Contact between 5pm-8pm.

28 Jul

Lymington (SO41)

New Solar PV Installation

Current Fuel Used: Gas. Number of Bedrooms: 5. Required location: Open to advice. Number of rooms: 11-15. Property Age:(...)

25 Jul

Southampton (SO17)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Other. Shading: Yes - Other. System size required: open to advice. Work Timescale: Within 1(...)

18 Jul

Southampton (SO40)

New Battery Installation (Solar PV)

Current system size: 10 Panels. Current inverter: Solar Edge. Battery location: Outside. Work Timescale: ASAP.

04 May

Eastleigh (SO53)

New Battery Installation (Solar PV)

Current system size: 4.2kw. Current inverter: solax. Battery location: cupboard. Work Timescale: ASAP.

05 Apr

Romsey (SO51)

New Solar Thermal Installation

Direction of roof: South East. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: Yes. Work Timescale: Within 6 Months.

20 Feb

Lymington (SO41)

New Solar PV Installation

Direction of roof: Unsure. Roof style: Unsure. Material: Unsure. Shading: None. System size required: open to advice. Work Timescale: ASAP. Additional notes:(...)

03 Feb

Alresford (SO24)

New Solar Thermal Installation

Direction of roof: South. Material: Metal. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: ASAP. Additional notes: For an Out(...)

19 Sep

Lyndhurst (SO43)

New Solar PV Installation

Direction of roof: South. Roof style: Pitched/Angled. Material: Tiled. Shading: Yes - Nearby tree. System size required: Discuss with engineer. Work Timescale:(...)

18 Aug

Lyndhurst (SO43)

Repair/Maintenance of Solar PV System

Current system size: 16 panels. Work Timescale: Within 3 Months. Additional notes: One panel has been damaged and needs replacing.

17 Aug

Alresford (SO24)

New Solar Thermal Installation

Direction of roof: South. Material: Tiled. Roof style: Pitched/Angled. Shading: None. Windows on roof: No. Work Timescale: ASAP. Additional notes: 300L Thermal(...)

30 Apr

Romsey (SO51)

New Solar PV Installation

Roof direction: South. Pitched & tiled. No shading. No windows. Open to suggestions regarding system size and battery. Install: within 6 months. Contact:(...)

14 Apr

Lymington (SO41)

New Solar PV Installation

Roof facing: South/West. Pitched and tiled. No shading. No windows. Open to advice on system size. Interested in discussing a battery installation. Is there(...)

08 Apr

Eastleigh (SO50)

New Solar PV Installation

Direction of roof: South. Pitched & Tiled. Some shading. No windows. 6kw. Interested in a battery. Install ASAP. Contact anytime.

31 Mar

Winchester (SO21)

New Solar PV Installation

Currently has a 2.19 Kw solar on the front roof and are looking at additional solar on the rear and a battery. Roof facing: ·····(...)

16 Feb

Winchester (SO22)

New Solar PV Installation

Roof: South West Facing. Flat Roof. No Shading. No Windows. Open to advice on System Size. Install within 6 months. Contact anytime.

23 Dec

Romsey (SO51)

New Battery Installation (Solar PV)

Current PV system: 32 panels. 16 on the house and 16 on the garage. Has 2 Current Inverters: Both are feronius igtl. Would like the battery installed in the(...)

10 Nov

Alresford (SO24)

New Solar PV Installation

Roof: South facing. Flat roof with slate. No shading. No windows on the roof. Install within 3 months. Contact anytime.

14 Aug

Lymington (SO41)

New Solar PV Installation

Roof: South West. Pitched and Tiled. There is no shading that will effect the panels, There are no windows int he roof. Looking for advice on the size system(...)

Don't just take our word for it.

Finding a good tradesperson is never easy. To help you decide who to hire, take a look at some of our genuine customer reviews. Honest, unbiased feedback from happy customers is a great place to start and should help you make an informed choice.

split shadow blue